IAC logo
IAC Assessment: MI0109
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0109
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Plastic Bottles
NAICS 326160 - Plastics Bottle Manufacturing
SIC 3085 - Plastics Bottles
Sales $10,000,000-$50,000,000
# of Employees 130
Plant Area (Sq.Ft.) 180,000
Annual Production 68,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $623,593 13,565,600 kWh $0.05
Electricity Demand $142,289 24,045 kW-months/year $5.92
Electricity Fees $102,909 - $ -
TOTAL ENERGY COSTS $868,791
RECOMMENDED SAVINGS* $71,277 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes
$ kWh $ kW-months/year $ $
01: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$30,000
Cost:
$20,000
- - - - $30,000 - -
-
kWh
-
-
kW-months/year
$30,000
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,226
Cost:
$1,350
$7,652 160,981 $1,574 276 - - $7,652
160,981
kWh
$1,574
276
kW-months/year
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$7,803
Cost:
$560
$6,668 144,729 $1,135 199 - - $6,668
144,729
kWh
$1,135
199
kW-months/year
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,952
Cost:
$400
$5,952 113,141 - - - - $5,952
113,141
kWh
-
-
kW-months/year
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$4,352
Cost:
$1,010
$4,352 67,012 - - - - $4,352
67,012
kWh
-
-
kW-months/year
-
-
$
06: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$3,825
Cost:
$346
$3,825 82,500 - - - - $3,825
82,500
kWh
-
-
kW-months/year
-
-
$
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$828
Cost:
-
$828 17,904 - - - - $828
17,904
kWh
-
-
kW-months/year
-
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$685
Cost:
$156
$685 15,006 - - - - $685
15,006
kWh
-
-
kW-months/year
-
-
$
09: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$8,606
Cost:
$23,253
$8,606 185,847 - - - - $8,606
185,847
kWh
-
-
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$71,277
Cost:
$47,075
$38,568 787,120 $2,709 475 $30,000 - $38,568
787,120
kWh
$2,709
475
kW-months/year
$30,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Personnel Changes Electricity Usage Electricity Demand Personnel Changes