IAC logo
IAC Assessment: MI0110
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0110
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 1,000,000
Annual Production 415,778 Tons
Production Hrs. Annual 7,200
Location (State) Fl
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $73,402 1,450,440 kWh $0.05
Electricity Demand $48,178 5,863 kW-months/year $8.22
Electricity Fees $14,757 - $ -
Natural Gas $1,536,393 903,761 MMBtu $1.70
TOTAL ENERGY COSTS $1,672,730
RECOMMENDED SAVINGS* $294,681 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Other Gas Administrative Changes Electricity Usage Other Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$122,911
Cost:
$75,000
- - $122,911 9,939 - - -
-
kWh
$122,911
9,939
MMBtu
-
-
$
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$117,785
Cost:
$2,470
- - $117,785 9,123 - - -
-
kWh
$117,785
9,123
MMBtu
-
-
$
03: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$49,464
Cost:
$16,000
- - - - $49,464 - -
-
kWh
-
-
MMBtu
$49,464
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,676
Cost:
$1,110
$3,676 48,911 - - - - $3,676
48,911
kWh
-
-
MMBtu
-
-
$
05: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$845
Cost:
$780
$845 13,349 - - - - $845
13,349
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$294,681
Cost:
$95,360
$4,521 62,260 $240,696 19,062 $49,464 - $4,521
62,260
kWh
$240,696
19,062
MMBtu
$49,464
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Other Gas Administrative Changes Electricity Usage Other Gas Administrative Changes