IAC logo
IAC Assessment: MI0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Biomedical devices
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $50,000,000-$100,000,000
# of Employees 400
Plant Area (Sq.Ft.) 350,000
Annual Production 40,000 Pieces
Production Hrs. Annual 6,350
Location (State) Fl
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $678,634 13,572,800 kWh $0.05
Electricity Demand $191,761 23,413 kW-months/year $8.19
Electricity Fees $126,143 - $ -
TOTAL ENERGY COSTS $996,538
RECOMMENDED SAVINGS* $34,846 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,352
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$13,372
Cost:
$200
$10,937 207,914 $2,435 297 $10,937
207,914
kWh
$2,435
297
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$13,290
Cost:
$84
$13,290 251,551 - - $13,290
251,551
kWh
-
-
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,062
Cost:
$7,706
$3,328 65,350 $734 90 $3,328
65,350
kWh
$734
90
kW-months/year
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,249
Cost:
-
$2,662 52,280 $587 72 $2,662
52,280
kWh
$587
72
kW-months/year
05: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$873
Cost:
$1,673
$726 13,260 $147 18 $726
13,260
kWh
$147
18
kW-months/year
TOTAL RECOMMENDED Savings:
$34,846
Cost:
$9,663
$30,943 590,355 $3,903 477 $30,943
590,355
kWh
$3,903
477
kW-months/year
TOTAL IMPLEMENTED Savings:
$17,352
Cost:
$7,790
$16,618 316,901 $734 90 $16,618
316,901
kWh
$734
90
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand