IAC logo
IAC Assessment: MI0113
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0113
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2005
Principal Product Bottled Juice
NAICS 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037 - Frozen Fruits And Vegetables
Sales $10,000,000-$50,000,000
# of Employees 100
Plant Area (Sq.Ft.) 67,000
Annual Production 4,030 Thousand Gallons
Production Hrs. Annual 2,500
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $242,673 4,215,600 kWh $0.06
Electricity Demand $109,352 18,216 kW-months/year $6.00
Electricity Fees $57,173 - $ -
Natural Gas $86,044 7,441 MMBtu $11.56
TOTAL ENERGY COSTS $495,242
RECOMMENDED SAVINGS* $45,221 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $36,105
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$21,712
Cost:
$52,535
$17,226 300,466 $4,486 748 - - $17,226
300,466
kWh
$4,486
748
kW-months/year
-
-
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$9,230
Cost:
$435
$9,230 165,712 - - - - $9,230
165,712
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$7,248
Cost:
$1,138
- - - - $7,248 605 -
-
kWh
-
-
kW-months/year
$7,248
605
MMBtu
04: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$5,163
Cost:
$17,100
- - - - $5,163 447 -
-
kWh
-
-
kW-months/year
$5,163
447
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,868
Cost:
$975
$1,317 22,975 $551 92 - - $1,317
22,975
kWh
$551
92
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$45,221
Cost:
$72,183
$27,773 489,153 $5,037 840 $12,411 1,052 $27,773
489,153
kWh
$5,037
840
kW-months/year
$12,411
1,052
MMBtu
TOTAL IMPLEMENTED Savings:
$36,105
Cost:
$70,070
$26,456 466,178 $4,486 748 $5,163 447 $26,456
466,178
kWh
$4,486
748
kW-months/year
$5,163
447
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas