IAC logo
IAC Assessment: MI0120
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0120
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2006
Principal Product Asphalt
NAICS 324121 - Asphalt Paving Mixture and Block Manufacturing
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $10,000,000-$50,000,000
# of Employees 120
Plant Area (Sq.Ft.) 100,000
Annual Production 5,000,000 Tons
Production Hrs. Annual 2,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,905 1,149,600 kWh $0.05
Electricity Demand $49,215 5,935 kW-months/year $8.29
Electricity Fees $11,730 - $ -
Other Gas $1,863,020 931,281 MMBtu $2.00
TOTAL ENERGY COSTS $1,983,870
RECOMMENDED SAVINGS* $332,807 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Gas Electricity Usage Electricity Demand Other Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.1116 IMPROVE COMBUSTION CONTROL CAPABILITY Savings:
$178,061
Cost:
$75,000
- - - - $178,061 10,263 -
-
kWh
-
-
kW-months/year
$178,061
10,263
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$145,490
Cost:
$5,540
- - - - $145,490 3,596 -
-
kWh
-
-
kW-months/year
$145,490
3,596
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,318
Cost:
-
$2,721 2,721 $2,597 313 - - $2,721
2,721
kWh
$2,597
313
kW-months/year
-
-
MMBtu
04: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$1,956
Cost:
$5,024
$1,526 29,289 $430 52 - - $1,526
29,289
kWh
$430
52
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,982
Cost:
$56
$938 18,000 $1,044 126 - - $938
18,000
kWh
$1,044
126
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$332,807
Cost:
$85,620
$5,185 50,010 $4,071 491 $323,551 13,859 $5,185
50,010
kWh
$4,071
491
kW-months/year
$323,551
13,859
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Other Gas Electricity Usage Electricity Demand Other Gas