IAC logo
IAC Assessment: MI0124
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0124
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2006
Principal Product Industrial Adhesives
NAICS 325520 - Adhesive Manufacturing
SIC 2891 - Adhesives And Sealants
Sales $100,000,000-$500,000,000
# of Employees 82
Plant Area (Sq.Ft.) 75,000
Annual Production 235,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $91,855 1,633,560 kWh $0.06
Electricity Demand $23,268 2,800 kW-months/year $8.31
Electricity Fees $14,961 - $ -
TOTAL ENERGY COSTS $130,084
RECOMMENDED SAVINGS* $55,540 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$17,063
Cost:
$40,180
$13,673 245,606 $3,390 408 $13,673
245,606
kWh
$3,390
408
kW-months/year
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,719
Cost:
$2,400
$2,979 53,520 $740 89 $2,979
53,520
kWh
$740
89
kW-months/year
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,540
Cost:
$28
$1,208 21,703 $332 40 $1,208
21,703
kWh
$332
40
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$950
Cost:
$1,018
$792 14,225 $158 19 $792
14,225
kWh
$158
19
kW-months/year
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$32,268
Cost:
$31,176
$32,268 579,627 - - $32,268
579,627
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$55,540
Cost:
$74,802
$50,920 914,681 $4,620 556 $50,920
914,681
kWh
$4,620
556
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand