IAC logo
IAC Assessment: MI0134
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0134
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2006
Principal Product Bakery Goods
NAICS 311812 - Commercial Bakeries
SIC 2051 - Bread, Cake, And Related Products
Sales $50,000,000-$100,000,000
# of Employees 300
Plant Area (Sq.Ft.) 230,000
Annual Production 65,314,000 Pounds
Production Hrs. Annual 7,488
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $992,459 16,404,000 kWh $0.06
Electricity Demand $199,701 33,963 kW-months/year $5.88
Electricity Fees $204,266 - $ -
Natural Gas $752,739 84,954 MMBtu $8.86
TOTAL ENERGY COSTS $2,149,165
RECOMMENDED SAVINGS* $249,241 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $144,930
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$99,039
Cost:
$135,000
$89,866 1,135,680 $9,173 1,560 $89,866
1,135,680
kWh
$9,173
1,560
kW-months/year
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$45,221
Cost:
$10,000
$40,409 510,667 $4,812 818 $40,409
510,667
kWh
$4,812
818
kW-months/year
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$45,075
Cost:
$16,854
$40,911 517,009 $4,164 708 $40,911
517,009
kWh
$4,164
708
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$35,182
Cost:
$964
$30,838 389,716 $4,344 739 $30,838
389,716
kWh
$4,344
739
kW-months/year
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$14,015
Cost:
$780
$12,683 153,730 $1,332 227 $12,683
153,730
kWh
$1,332
227
kW-months/year
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,709
Cost:
$30
$8,716 110,145 $1,993 338 $8,716
110,145
kWh
$1,993
338
kW-months/year
TOTAL RECOMMENDED Savings:
$249,241
Cost:
$163,628
$223,423 2,816,947 $25,818 4,390 $223,423
2,816,947
kWh
$25,818
4,390
kW-months/year
TOTAL IMPLEMENTED Savings:
$144,930
Cost:
$135,994
$129,420 1,635,541 $15,510 2,637 $129,420
1,635,541
kWh
$15,510
2,637
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand