IAC logo
IAC Assessment: MI0138
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0138
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2006
Principal Product Fiber Cans
NAICS 322219 - Other Paperboard Container Manufacturing
SIC 2655 - Fiber Cans, Drums & Similar Products
Sales $50,000,000-$100,000,000
# of Employees 99
Plant Area (Sq.Ft.) 200,000
Annual Production 1,350,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $531,564 7,156,200 kWh $0.07
Electricity Demand $56,490 16,374 kW-months/year $3.45
Electricity Fees $49,699 - $ -
Natural Gas $278,725 28,863 MMBtu $9.66
TOTAL ENERGY COSTS $916,478
RECOMMENDED SAVINGS* $138,037 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $38,928
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$38,928
Cost:
$1,074
$35,880 447,156 $3,048 883 - - $35,880
447,156
kWh
$3,048
883
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$28,014
Cost:
$20,014
$28,014 349,128 - - - - $28,014
349,128
kWh
-
-
kW-months/year
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,551
Cost:
$54,600
$20,829 259,584 $1,722 42 - - $20,829
259,584
kWh
$1,722
42
kW-months/year
-
-
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$19,522
Cost:
$30
$18,193 226,733 $1,329 385 - - $18,193
226,733
kWh
$1,329
385
kW-months/year
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$18,750
Cost:
$4,708
- - - - $18,750 1,931 -
-
kWh
-
-
kW-months/year
$18,750
1,931
MMBtu
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$4,001
Cost:
$9,540
$3,656 45,569 $345 100 - - $3,656
45,569
kWh
$345
100
kW-months/year
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,808
Cost:
$713
$3,793 47 $15 4 - - $3,793
47
kWh
$15
4
kW-months/year
-
-
MMBtu
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$2,463
Cost:
$142
$2,329 25,901 $134 38 - - $2,329
25,901
kWh
$134
38
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$138,037
Cost:
$90,821
$112,694 1,354,118 $6,593 1,452 $18,750 1,931 $112,694
1,354,118
kWh
$6,593
1,452
kW-months/year
$18,750
1,931
MMBtu
TOTAL IMPLEMENTED Savings:
$38,928
Cost:
$1,074
$35,880 447,156 $3,048 883 - - $35,880
447,156
kWh
$3,048
883
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu