IAC logo
IAC Assessment: MI0139
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0139
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2006
Principal Product Aluminum Tubing
NAICS 331318 - Other Aluminum Rolling, Drawing, and Extruding
SIC 3354 - Aluminum Extruded Products
Sales $10,000,000-$50,000,000
# of Employees 200
Plant Area (Sq.Ft.) 150,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 6,600
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,311,464 17,556,420 kWh $0.07
Electricity Demand $412,640 52,167 kW-months/year $7.91
Electricity Fees $243,274 - $ -
TOTAL ENERGY COSTS $1,967,378
RECOMMENDED SAVINGS* $107,687 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $66,886
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$36,785
Cost:
$1,074
$31,595 422,962 $5,190 199 $31,595
422,962
kWh
$5,190
199
kW-months/year
02: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$26,909
Cost:
$30
$20,740 277 $6,169 131 $20,740
277
kWh
$6,169
131
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$25,014
Cost:
$50,232
$21,407 286 $3,607 456 $21,407
286
kWh
$3,607
456
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,787
Cost:
$40,200
$13,240 177 $2,547 322 $13,240
177
kWh
$2,547
322
kW-months/year
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,192
Cost:
$5,000
$3,192 93 - - $3,192
93
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$107,687
Cost:
$96,536
$90,174 423,795 $17,513 1,108 $90,174
423,795
kWh
$17,513
1,108
kW-months/year
TOTAL IMPLEMENTED Savings:
$66,886
Cost:
$6,104
$55,527 423,332 $11,359 330 $55,527
423,332
kWh
$11,359
330
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand