IAC logo
IAC Assessment: MI0154
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0154
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2007
Principal Product Aircraft parts
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $10,000,000-$50,000,000
# of Employees 240
Plant Area (Sq.Ft.) 277,000
Annual Production 11,500 Pieces
Production Hrs. Annual 8,400
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $448,522 6,506,400 kWh $0.07
Electricity Demand $116,871 11,377 kW-months/year $10.27
Electricity Fees $98,332 - $ -
TOTAL ENERGY COSTS $663,725
RECOMMENDED SAVINGS* $216,374 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $79,007
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$99,787
Cost:
$131,000
$82,492 1,178,460 $17,295 1,684 - - - - $82,492
1,178,460
kWh
$17,295
1,684
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$41,215
Cost:
$73,710
$34,294 490,614 - - $6,921 - - - $34,294
490,614
kWh
-
-
kW-months/year
$6,921
-
$
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$30,511
Cost:
$120
$25,212 360,180 $5,299 516 - - - - $25,212
360,180
kWh
$5,299
516
kW-months/year
-
-
$
-
-
$
04: 2.7122 DISCONNECT BALLASTS Savings:
$27,192
Cost:
$1,450
$18,319 262,080 $8,873 864 - - - - $18,319
262,080
kWh
$8,873
864
kW-months/year
-
-
$
-
-
$
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$10,388
Cost:
$1,250
$8,560 124,452 $1,828 178 - - - - $8,560
124,452
kWh
$1,828
178
kW-months/year
-
-
$
-
-
$
06: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$3,146
Cost:
$300
- - - - - - $3,146 - -
-
kWh
-
-
kW-months/year
-
-
$
$3,146
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,092
Cost:
$1,074
$2,479 35,421 $613 60 - - - - $2,479
35,421
kWh
$613
60
kW-months/year
-
-
$
-
-
$
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,043
Cost:
$30
$796 11,365 $247 24 - - - - $796
11,365
kWh
$247
24
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$216,374
Cost:
$208,934
$172,152 2,462,572 $34,155 3,326 $6,921 - $3,146 - $172,152
2,462,572
kWh
$34,155
3,326
kW-months/year
$6,921
-
$
$3,146
-
$
TOTAL IMPLEMENTED Savings:
$79,007
Cost:
$75,234
$62,781 897,580 $6,159 600 $6,921 - $3,146 - $62,781
897,580
kWh
$6,159
600
kW-months/year
$6,921
-
$
$3,146
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Administrative Changes Electricity Usage Electricity Demand Electricity Fees Administrative Changes