Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2007 |
Principal Product | Processed Fresh Produce |
NAICS | 311991 - Perishable Prepared Food Manufacturing |
SIC | 2099 - Food Preparations, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 380 |
Plant Area (Sq.Ft.) | 90,000 |
Annual Production | 100,000,000 Pounds |
Production Hrs. Annual | 7,200 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $582,404 | 7,524,000 | kWh | $0.08 |
Electricity Demand | $45,809 | 13,305 | kW-months/year | $3.44 |
Electricity Fees | $93,390 | - | $ | - |
TOTAL ENERGY COSTS | $721,603 | |||
RECOMMENDED SAVINGS* | $209,293 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | - |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Other Gas | Electricity Usage | Electricity Demand | Other Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD |
Savings: $66,401 Cost: $120,000 |
- | - | - | - | $66,401 | 338 |
- - kWh |
- - kW-months/year |
$66,401 338 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $51,399 Cost: $22,558 |
$48,515 | 537,265 | $2,884 | 861 | - | - |
$48,515 537,265 kWh |
$2,884 861 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $31,061 Cost: $2,665 |
$29,034 | 362,925 | $2,027 | 605 | - | - |
$29,034 362,925 kWh |
$2,027 605 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $16,549 Cost: $23,640 |
$15,469 | 185,926 | $1,080 | 310 | - | - |
$15,469 185,926 kWh |
$1,080 310 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $14,901 Cost: $27,300 |
$14,065 | 155,750 | $836 | 250 | - | - |
$14,065 155,750 kWh |
$836 250 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $13,760 Cost: $1,074 |
$13,679 | 160,925 | $81 | 24 | - | - |
$13,679 160,925 kWh |
$81 24 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.2696 USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS |
Savings: $7,524 Cost: $7,800 |
$7,032 | 87,900 | $492 | 147 | - | - |
$7,032 87,900 kWh |
$492 147 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $4,179 Cost: $30 |
$4,004 | 47,104 | $175 | 53 | - | - |
$4,004 47,104 kWh |
$175 53 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $1,909 Cost: $180 |
$1,547 | 19,336 | $362 | 108 | - | - |
$1,547 19,336 kWh |
$362 108 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $1,610 Cost: $3,010 |
$1,514 | 17,816 | $96 | 29 | - | - |
$1,514 17,816 kWh |
$96 29 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $209,293 Cost: $208,257 |
$134,859 | 1,574,947 | $8,033 | 2,387 | $66,401 | 338 | $134,859 1,574,947 kWh |
$8,033 2,387 kW-months/year |
$66,401 338 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: - Cost: - |
- | - | - | - | - | - | - - kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |