IAC Assessment: MI0156
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2007
Principal Product Glass and Plastic Ware
NAICS 327212 - Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3089 - Plastics Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 80
Plant Area (Sq.Ft.) 30,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 4,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,338 726,475 kWh $0.06
Electricity Demand $14,983 2,305 kW-months/year $6.50
Electricity Fees $5,804 - $ -
Natural Gas $51,903 5,215 MMBtu $9.95
TOTAL ENERGY COSTS $118,028
RECOMMENDED SAVINGS* $24,812 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,395
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2424 USE HEAT IN FLUE GASES TO PREHEAT PRODUCTS OR MATERIALS Savings:
$7,785
Cost:
$1,800
- - - - $7,785 783 -
-
kWh
-
-
kW-months/year
$7,785
783
MMBtu
02: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$6,674
Cost:
$1,232
- - - - $6,674 671 -
-
kWh
-
-
kW-months/year
$6,674
671
MMBtu
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$4,301
Cost:
$2,121
$3,364 49,975 $937 144 - - $3,364
49,975
kWh
$937
144
kW-months/year
-
-
MMBtu
04: 2.7145 INSTALL SKYLIGHTS Savings:
$2,655
Cost:
$5,612
$2,077 60,850 $578 89 - - $2,077
60,850
kWh
$578
89
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,688
Cost:
$1,074
$1,286 19,100 $402 62 - - $1,286
19,100
kWh
$402
62
kW-months/year
-
-
MMBtu
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,033
Cost:
$30
$912 13,549 $121 18 - - $912
13,549
kWh
$121
18
kW-months/year
-
-
MMBtu
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$676
Cost:
$2,170
$605 7,927 $71 11 - - $605
7,927
kWh
$71
11
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$24,812
Cost:
$14,039
$8,244 151,401 $2,109 324 $14,459 1,454 $8,244
151,401
kWh
$2,109
324
kW-months/year
$14,459
1,454
MMBtu
TOTAL IMPLEMENTED Savings:
$9,395
Cost:
$2,336
$2,198 32,649 $523 80 $6,674 671 $2,198
32,649
kWh
$523
80
kW-months/year
$6,674
671
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas