IAC logo
IAC Assessment: MI0158
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0158
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2007
Principal Product Medical and Laboratory Rubber Sundries
NAICS 326299 - All Other Rubber Product Manufacturing
SIC 3069 - Fabricated Rubber Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 125,000
Annual Production 50,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,047,150 13,922,476 kWh $0.08
Electricity Demand $83,644 24,822 kW-months/year $3.37
Electricity Fees $73,853 - $ -
Natural Gas $527,254 452,950 MMBtu $1.16
TOTAL ENERGY COSTS $1,731,901
RECOMMENDED SAVINGS* $246,337 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $206,219
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$92,023
Cost:
$8,580
$86,729 1,077,381 $5,294 1,539 - - $86,729
1,077,381
kWh
$5,294
1,539
kW-months/year
-
-
MMBtu
02: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$55,437
Cost:
$101,347
$45,097 560,166 $10,340 235 - - $45,097
560,166
kWh
$10,340
235
kW-months/year
-
-
MMBtu
03: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$21,358
Cost:
$46,238
$20,174 250,605 $1,184 344 - - $20,174
250,605
kWh
$1,184
344
kW-months/year
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$21,963
Cost:
$20,900
$20,745 257,712 $1,218 354 - - $20,745
257,712
kWh
$1,218
354
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$14,507
Cost:
$1,210
$14,088 175,000 $419 122 - - $14,088
175,000
kWh
$419
122
kW-months/year
-
-
MMBtu
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$13,330
Cost:
$1,700
- - - - $13,330 11,632 -
-
kWh
-
-
kW-months/year
$13,330
11,632
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$9,478
Cost:
$5,967
$9,433 117,307 $45 13 - - $9,433
117,307
kWh
$45
13
kW-months/year
-
-
MMBtu
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$9,282
Cost:
$3,475
$9,009 111,909 $273 79 - - $9,009
111,909
kWh
$273
79
kW-months/year
-
-
MMBtu
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$5,073
Cost:
$40
$4,732 58,778 $341 100 - - $4,732
58,778
kWh
$341
100
kW-months/year
-
-
MMBtu
10: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,886
Cost:
$2,000
- - - - $3,886 1,619 -
-
kWh
-
-
kW-months/year
$3,886
1,619
MMBtu
TOTAL RECOMMENDED Savings:
$246,337
Cost:
$191,457
$210,007 2,608,858 $19,114 2,786 $17,216 13,251 $210,007
2,608,858
kWh
$19,114
2,786
kW-months/year
$17,216
13,251
MMBtu
TOTAL IMPLEMENTED Savings:
$206,219
Cost:
$135,777
$171,391 2,129,037 $17,612 2,350 $17,216 13,251 $171,391
2,129,037
kWh
$17,612
2,350
kW-months/year
$17,216
13,251
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas