Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2008 |
Principal Product | Pharmaceutical Medication |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $100,000,000-$500,000,000 |
# of Employees | 143 |
Plant Area (Sq.Ft.) | 1,000,000 |
Annual Production | 100,000 Pounds |
Production Hrs. Annual | 8,568 |
Location (State) | PR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $2,447,109 | 17,041,200 | kWh | $0.14 |
Electricity Demand | $227,658 | 27,989 | kW-months/year | $8.13 |
Electricity Fees | $20,151 | - | $ | - |
Fuel Oil #6 | $2,018,471 | 104,310 | MMBtu | $19.35 |
TOTAL ENERGY COSTS | $4,713,389 | |||
RECOMMENDED SAVINGS* | $1,418,768 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $195,738 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Fuel Oil #6 | Ancillary Material Cost | Electricity Usage | Electricity Demand | Fuel Oil #6 | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2423 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM |
Savings: $1,069,901 Cost: $2,000,000 |
$479,531 | 3,339,353 | $38,829 | 398 | $551,541 | 22,802 | - | - |
$479,531 3,339,353 kWh |
$38,829 398 kW-months/year |
$551,541 22,802 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.2161 CLOSELY MONITOR CHEMICAL ADDITIONS TO INCREASE BATH LIFE |
Savings: $98,398 Cost: $18,460 |
- | - | - | - | - | - | $98,398 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$98,398 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $86,183 Cost: $45,980 |
$79,851 | 556,064 | $6,332 | 779 | - | - | - | - |
$79,851 556,064 kWh |
$6,332 779 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $73,832 Cost: $1,750 |
- | - | - | - | $73,832 | 3,816 | - | - |
- - kWh |
- - kW-months/year |
$73,832 3,816 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $61,527 Cost: $56,000 |
- | - | - | - | $61,527 | 3,180 | - | - |
- - kWh |
- - kW-months/year |
$61,527 3,180 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2113 REPAIR OR REPLACE STEAM TRAPS |
Savings: $11,109 Cost: $400 |
- | - | - | - | $11,109 | 736 | - | - |
- - kWh |
- - kW-months/year |
$11,109 736 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $8,769 Cost: $1,210 |
$8,105 | 56,442 | $664 | 82 | - | - | - | - |
$8,105 56,442 kWh |
$664 82 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $5,419 Cost: $4,800 |
$5,001 | 34,828 | $418 | 52 | - | - | - | - |
$5,001 34,828 kWh |
$418 52 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,630 Cost: $40 |
$3,350 | 23,331 | $280 | 35 | - | - | - | - |
$3,350 23,331 kWh |
$280 35 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,418,768 Cost: $2,128,640 |
$575,838 | 4,010,018 | $46,523 | 1,346 | $698,009 | 30,534 | $98,398 | - | $575,838 4,010,018 kWh |
$46,523 1,346 kW-months/year |
$698,009 30,534 MMBtu |
$98,398 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $195,738 Cost: $21,860 |
$11,455 | 79,773 | $944 | 117 | $84,941 | 4,552 | $98,398 | - | $11,455 79,773 kWh |
$944 117 kW-months/year |
$84,941 4,552 MMBtu |
$98,398 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Fuel Oil #6 | Ancillary Material Cost | Electricity Usage | Electricity Demand | Fuel Oil #6 | Ancillary Material Cost |