IAC Assessment: MI0171
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0171
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2008
Principal Product plastic piping
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $10,000,000-$50,000,000
# of Employees 398
Plant Area (Sq.Ft.) 100,000
Annual Production 3,500,000 Pounds
Production Hrs. Annual 8,400
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,331,949 12,876,600 kWh $0.18
Electricity Demand $250,588 31,129 kW-months/year $8.05
Electricity Fees $5,400 - $ -
TOTAL ENERGY COSTS $2,587,937
RECOMMENDED SAVINGS* $586,599 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$170,598
Cost:
$351,000
$157,834 1,099,123 $12,764 1,570 $157,834
1,099,123
kWh
$12,764
1,570
kW-months/year
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$131,514
Cost:
$7,800
$121,586 846,702 $9,928 102 $121,586
846,702
kWh
$9,928
102
kW-months/year
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$110,098
Cost:
$168,305
$101,859 709,234 $8,239 1,410 $101,859
709,234
kWh
$8,239
1,410
kW-months/year
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$101,069
Cost:
$53,922
$93,644 652,111 $7,425 913 $93,644
652,111
kWh
$7,425
913
kW-months/year
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$42,003
Cost:
$860
$38,917 271,009 $3,086 380 $38,917
271,009
kWh
$3,086
380
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$31,317
Cost:
$1,210
$26,959 187,740 $4,358 536 $26,959
187,740
kWh
$4,358
536
kW-months/year
TOTAL RECOMMENDED Savings:
$586,599
Cost:
$583,097
$540,799 3,765,919 $45,800 4,911 $540,799
3,765,919
kWh
$45,800
4,911
kW-months/year
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand