IAC logo
IAC Assessment: MI0178
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0178
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2009
Principal Product Turbine Blades
NAICS 333611 - Turbine and Turbine Generator Set Units Manufacturing
SIC 3511 - Turbines And Turbine Generator Sets
Sales $10,000,000-$50,000,000
# of Employees 350
Plant Area (Sq.Ft.) 200,000
Annual Production 10,000 Pieces
Production Hrs. Annual 8,568
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $870,561 13,946,397 kWh $0.06
Electricity Demand $297,291 34,024 kW-months/year $8.74
Electricity Fees $161,419 - $ -
TOTAL ENERGY COSTS $1,329,271
RECOMMENDED SAVINGS* $203,215 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $78,463
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$88,417
Cost:
$70,875
$83,505 947,835 $4,912 1,328 $83,505
947,835
kWh
$4,912
1,328
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$53,553
Cost:
$7,140
$50,578 574,097 $2,975 804 $50,578
574,097
kWh
$2,975
804
kW-months/year
03: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$18,854
Cost:
$40,320
$17,961 172,229 $893 241 $17,961
172,229
kWh
$893
241
kW-months/year
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$17,481
Cost:
$11,118
$16,510 187,404 $971 262 $16,510
187,404
kWh
$971
262
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,720
Cost:
$1,210
$17,718 207,474 $1,002 272 $17,718
207,474
kWh
$1,002
272
kW-months/year
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,908
Cost:
$4,531
$2,719 31,833 $189 52 $2,719
31,833
kWh
$189
52
kW-months/year
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$3,282
Cost:
$40
$3,016 35,316 $266 72 $3,016
35,316
kWh
$266
72
kW-months/year
TOTAL RECOMMENDED Savings:
$203,215
Cost:
$135,234
$192,007 2,156,188 $11,208 3,031 $192,007
2,156,188
kWh
$11,208
3,031
kW-months/year
TOTAL IMPLEMENTED Savings:
$78,463
Cost:
$12,921
$74,031 848,720 $4,432 1,200 $74,031
848,720
kWh
$4,432
1,200
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand