IAC logo
IAC Assessment: MI0193
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0193
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2010
Principal Product Fruit Juice
NAICS 311421 - Fruit and Vegetable Canning
SIC 2033 - Canned Fruits And Vegetables
Sales $50,000,000-$100,000,000
# of Employees 160
Plant Area (Sq.Ft.) 250,000
Annual Production 29,070,000 Pieces
Production Hrs. Annual 6,120
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,556,824 15,568,240 kWh $0.10
Natural Gas $617,414 44,101 MMBtu $14.00
TOTAL ENERGY COSTS $2,174,238
RECOMMENDED SAVINGS* $359,936 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $194,110
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$159,261
Cost:
$64,000
- - - - $159,261 11,375 -
-
kWh
-
-
kW-months/year
$159,261
11,375
MMBtu
02: 2.2447 HEAT WATER WITH EXHAUST HEAT Savings:
$100,762
Cost:
$23,000
$11,360 113,641 $2,230 223 $87,172 5,798 $11,360
113,641
kWh
$2,230
223
kW-months/year
$87,172
5,798
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$58,162
Cost:
$63,083
$57,231 572,311 $931 94 - - $57,231
572,311
kWh
$931
94
kW-months/year
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,000
Cost:
$1,210
$14,169 141,688 $3,831 384 - - $14,169
141,688
kWh
$3,831
384
kW-months/year
-
-
MMBtu
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$15,004
Cost:
$40
$12,717 127,167 $2,287 228 - - $12,717
127,167
kWh
$2,287
228
kW-months/year
-
-
MMBtu
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$6,565
Cost:
$4,531
$5,790 57,897 $775 78 - - $5,790
57,897
kWh
$775
78
kW-months/year
-
-
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,182
Cost:
$1,750
- - - - $2,182 155 -
-
kWh
-
-
kW-months/year
$2,182
155
MMBtu
TOTAL RECOMMENDED Savings:
$359,936
Cost:
$157,614
$101,267 1,012,704 $10,054 1,007 $248,615 17,328 $101,267
1,012,704
kWh
$10,054
1,007
kW-months/year
$248,615
17,328
MMBtu
TOTAL IMPLEMENTED Savings:
$194,110
Cost:
$89,083
$95,477 954,807 $9,279 929 $89,354 5,953 $95,477
954,807
kWh
$9,279
929
kW-months/year
$89,354
5,953
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas