IAC Assessment: MI0199
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0199
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2010
Principal Product Gas Welding Equipment
NAICS 333992 - Welding and Soldering Equipment Manufacturing
SIC 3548 - Welding Apparatus
Sales $50,000,000-$100,000,000
# of Employees 230
Plant Area (Sq.Ft.) 120,000
Annual Production 500,000 Pieces
Production Hrs. Annual 5,355
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $475,839 4,758,392 kWh $0.10
TOTAL ENERGY COSTS $475,839
RECOMMENDED SAVINGS* $121,202 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $112,576
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$37,073
Cost:
$6,280
$30,286 302,864 $6,787 679 $30,286
302,864
kWh
$6,787
679
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$31,106
Cost:
$2,000
$25,394 253,938 $5,712 569 $25,394
253,938
kWh
$5,712
569
kW-months/year
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,329
Cost:
$1,210
$8,448 84,482 $3,881 388 $8,448
84,482
kWh
$3,881
388
kW-months/year
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$10,308
Cost:
$7,450
$8,421 84,209 $1,887 189 $8,421
84,209
kWh
$1,887
189
kW-months/year
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$9,954
Cost:
$2,200
$7,874 78,742 $2,080 208 $7,874
78,742
kWh
$2,080
208
kW-months/year
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$8,626
Cost:
$1,786
$7,047 70,472 $1,579 158 $7,047
70,472
kWh
$1,579
158
kW-months/year
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,254
Cost:
$5,975
$5,924 59,240 $1,330 133 $5,924
59,240
kWh
$1,330
133
kW-months/year
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$4,552
Cost:
$4,531
$3,853 38,526 $699 70 $3,853
38,526
kWh
$699
70
kW-months/year
TOTAL RECOMMENDED Savings:
$121,202
Cost:
$31,432
$97,247 972,473 $23,955 2,394 $97,247
972,473
kWh
$23,955
2,394
kW-months/year
TOTAL IMPLEMENTED Savings:
$112,576
Cost:
$29,646
$90,200 902,001 $22,376 2,236 $90,200
902,001
kWh
$22,376
2,236
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand