IAC logo
IAC Assessment: MI0207
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0207
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2011
Principal Product Medical Instruments
NAICS 339112 - Surgical and Medical Instrument Manufacturing
SIC 3841 - Surgical And Medical Instruments
Sales $100,000,000-$500,000,000
# of Employees 450
Plant Area (Sq.Ft.) 364,000
Annual Production 250,000 Pieces
Production Hrs. Annual 7,344
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,322,200 13,222,000 kWh $0.10
Electricity Demand $216,046 21,605 kW-months/year $10.00
TOTAL ENERGY COSTS $1,538,246
RECOMMENDED SAVINGS* $320,953 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $79,827
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$123,852
Cost:
$137,314
$106,452 1,064,516 $17,400 1,740 $106,452
1,064,516
kWh
$17,400
1,740
kW-months/year
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$76,417
Cost:
$150,000
$65,687 656,866 $10,730 1,073 $65,687
656,866
kWh
$10,730
1,073
kW-months/year
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$61,926
Cost:
$2,550
$53,226 532,258 $8,700 870 $53,226
532,258
kWh
$8,700
870
kW-months/year
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$33,207
Cost:
$8,474
$28,547 285,466 $4,660 466 $28,547
285,466
kWh
$4,660
466
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$17,901
Cost:
$1,320
$15,391 153,906 $2,510 251 $15,391
153,906
kWh
$2,510
251
kW-months/year
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,650
Cost:
$9,200
$6,574 65,744 $1,076 108 $6,574
65,744
kWh
$1,076
108
kW-months/year
TOTAL RECOMMENDED Savings:
$320,953
Cost:
$308,858
$275,877 2,758,756 $45,076 4,508 $275,877
2,758,756
kWh
$45,076
4,508
kW-months/year
TOTAL IMPLEMENTED Savings:
$79,827
Cost:
$3,870
$68,617 686,164 $11,210 1,121 $68,617
686,164
kWh
$11,210
1,121
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand