Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2011 |
Principal Product | Fruit Juice |
NAICS | 311411 - Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037 - Frozen Fruits And Vegetables |
Sales | $100,000,000-$500,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 596,557 |
Annual Production | 80,000 Thousand Gallons |
Production Hrs. Annual | 8,736 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $1,321,822 | 18,938,400 | kWh | $0.07 |
Electricity Demand | $81,251 | 70,440 | kW-months/year | $1.15 |
Electricity Fees | $42,507 | - | $ | - |
Natural Gas | $182,886 | 35,683 | MMBtu | $5.13 |
TOTAL ENERGY COSTS | $1,628,467 | |||
RECOMMENDED SAVINGS* | $126,005 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $83,661 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $25,532 Cost: $213,119 |
$22,032 | 314,743 | $3,500 | 3,036 | - | - |
$22,032 314,743 kWh |
$3,500 3,036 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $25,191 Cost: $41,400 |
$24,634 | 351,921 | $557 | 483 | - | - |
$24,634 351,921 kWh |
$557 483 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $24,390 Cost: $25,000 |
- | - | - | - | $24,390 | 4,525 |
- - kWh |
- - kW-months/year |
$24,390 4,525 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $22,111 Cost: $1,320 |
$21,508 | 307,258 | $603 | 523 | - | - |
$21,508 307,258 kWh |
$603 523 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2447 HEAT WATER WITH EXHAUST HEAT |
Savings: $16,479 Cost: $30,000 |
- | - | - | - | $16,479 | 3,265 |
- - kWh |
- - kW-months/year |
$16,479 3,265 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $5,771 Cost: $1,950 |
- | - | - | - | $5,771 | 1,125 |
- - kWh |
- - kW-months/year |
$5,771 1,125 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $3,618 Cost: $50 |
$3,438 | 49,113 | $180 | 156 | - | - |
$3,438 49,113 kWh |
$180 156 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,475 Cost: $1,720 |
$1,443 | 20,617 | $32 | 28 | - | - |
$1,443 20,617 kWh |
$32 28 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $1,438 Cost: $4,571 |
$1,408 | 20,111 | $30 | 25 | - | - |
$1,408 20,111 kWh |
$30 25 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $126,005 Cost: $319,130 |
$74,463 | 1,063,763 | $4,902 | 4,251 | $46,640 | 8,915 | $74,463 1,063,763 kWh |
$4,902 4,251 kW-months/year |
$46,640 8,915 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $83,661 Cost: $262,410 |
$73,020 | 1,043,146 | $4,870 | 4,223 | $5,771 | 1,125 | $73,020 1,043,146 kWh |
$4,870 4,223 kW-months/year |
$5,771 1,125 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |