Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2011
Principal Product Marketing Media
NAICS 323111 - Commercial Printing (except Screen and Books)
SIC 2752 - Commercial Printing, Lithographic
Sales $5,000,000-$10,000,000
# of Employees 70
Plant Area (Sq.Ft.) 75,000
Annual Production 7,000,000 Pieces
Production Hrs. Annual 4,290
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $97,672 1,814,800 kWh $0.05
Electricity Demand $59,127 5,639 kW-months/year $10.49
Electricity Fees $23,240 - $ -
TOTAL ENERGY COSTS $180,039
RECOMMENDED SAVINGS* $44,517 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$22,567
Cost:
$75,000
$17,524 250,337 $5,043 481 $17,524
250,337
kWh
$5,043
481
kW-months/year
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,602
Cost:
$9,200
$5,474 78,205 $1,128 108 $5,474
78,205
kWh
$1,128
108
kW-months/year
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,091
Cost:
$2,600
$4,088 68,138 $2,003 191 $4,088
68,138
kWh
$2,003
191
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$3,896
Cost:
$6,665
$2,746 39,232 $1,150 110 $2,746
39,232
kWh
$1,150
110
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,074
Cost:
$4,800
$1,382 19,749 $692 66 $1,382
19,749
kWh
$692
66
kW-months/year
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,802
Cost:
$1,300
$1,270 18,148 $532 51 $1,270
18,148
kWh
$532
51
kW-months/year
07: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$984
Cost:
$1,993
$693 9,912 $291 28 $693
9,912
kWh
$291
28
kW-months/year
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$501
Cost:
$50
$340 4,861 $161 16 $340
4,861
kWh
$161
16
kW-months/year
TOTAL RECOMMENDED Savings:
$44,517
Cost:
$101,608
$33,517 488,582 $11,000 1,051 $33,517
488,582
kWh
$11,000
1,051
kW-months/year
TOTAL IMPLEMENTED Savings:
-