IAC logo
IAC Assessment: MI0213
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0213
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2011
Principal Product Drill Bits
NAICS 333517 - Machine Tool Manufacturing
SIC 3541 - Machine Tools, Metal Cutting Types
Sales $5,000,000-$10,000,000
# of Employees 95
Plant Area (Sq.Ft.) 10,000
Annual Production 50,000 Pieces
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $47,168 819,164 kWh $0.06
Electricity Demand $18,313 2,017 kW-months/year $9.08
Electricity Fees $6,012 - $ -
TOTAL ENERGY COSTS $71,494
RECOMMENDED SAVINGS* $20,350 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,817
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$5,935
Cost:
$14,200
$4,230 65,079 $1,705 188 $4,230
65,079
kWh
$1,705
188
kW-months/year
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$4,640
Cost:
$1,300
$3,305 50,843 $1,335 147 $3,305
50,843
kWh
$1,335
147
kW-months/year
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,899
Cost:
$4,000
$2,073 31,886 $826 91 $2,073
31,886
kWh
$826
91
kW-months/year
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,184
Cost:
$1,320
$1,558 23,975 $626 69 $1,558
23,975
kWh
$626
69
kW-months/year
05: 2.7233 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT Savings:
$1,255
Cost:
$350
$892 13,728 $363 40 $892
13,728
kWh
$363
40
kW-months/year
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,430
Cost:
$1,860
$1,021 15,700 $409 45 $1,021
15,700
kWh
$409
45
kW-months/year
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,260
Cost:
$2,830
$897 13,790 $363 40 $897
13,790
kWh
$363
40
kW-months/year
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$747
Cost:
$900
$532 8,192 $215 24 $532
8,192
kWh
$215
24
kW-months/year
TOTAL RECOMMENDED Savings:
$20,350
Cost:
$26,760
$14,508 223,193 $5,842 644 $14,508
223,193
kWh
$5,842
644
kW-months/year
TOTAL IMPLEMENTED Savings:
$6,817
Cost:
$4,060
$4,858 74,735 $1,959 216 $4,858
74,735
kWh
$1,959
216
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand