IAC logo
IAC Assessment: MI0218
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0218
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2012
Principal Product Industrial Organic Chemicals
NAICS 325199 - All Other Basic Organic Chemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 156
Plant Area (Sq.Ft.) 2,003,760
Annual Production 36,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,278,779 30,943,249 kWh $0.07
Electricity Demand $559,728 47,255 kW-months/year $11.84
Electricity Fees $106,656 - $ -
Natural Gas $1,603,321 277,341 MMBtu $5.78
TOTAL ENERGY COSTS $4,548,484
RECOMMENDED SAVINGS* $302,325 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $85,074
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$78,730
Cost:
$63,811
$64,540 872,159 $14,190 1,198 - - $64,540
872,159
kWh
$14,190
1,198
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$71,478
Cost:
$47,240
$58,595 791,822 $12,883 1,088 - - $58,595
791,822
kWh
$12,883
1,088
kW-months/year
-
-
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$53,118
Cost:
$2,520
- - - - $53,118 9,190 -
-
kWh
-
-
kW-months/year
$53,118
9,190
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$25,712
Cost:
$21,000
$21,081 284,877 $4,631 391 - - $21,081
284,877
kWh
$4,631
391
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,901
Cost:
$1,660
$17,952 242,596 $3,949 334 - - $17,952
242,596
kWh
$3,949
334
kW-months/year
-
-
MMBtu
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$19,917
Cost:
$6,660
$16,328 220,649 $3,589 303 - - $16,328
220,649
kWh
$3,589
303
kW-months/year
-
-
MMBtu
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,529
Cost:
$8,200
$10,267 138,747 $2,262 191 - - $10,267
138,747
kWh
$2,262
191
kW-months/year
-
-
MMBtu
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$10,055
Cost:
$80
$7,593 102,606 $2,462 208 - - $7,593
102,606
kWh
$2,462
208
kW-months/year
-
-
MMBtu
09: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,885
Cost:
$13,800
$7,286 98,456 $1,599 135 - - $7,286
98,456
kWh
$1,599
135
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$302,325
Cost:
$164,971
$203,642 2,751,912 $45,565 3,848 $53,118 9,190 $203,642
2,751,912
kWh
$45,565
3,848
kW-months/year
$53,118
9,190
MMBtu
TOTAL IMPLEMENTED Savings:
$85,074
Cost:
$4,260
$25,545 345,202 $6,411 542 $53,118 9,190 $25,545
345,202
kWh
$6,411
542
kW-months/year
$53,118
9,190
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas