IAC logo
IAC Assessment: MI0222
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0222
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2012
Principal Product Propylene
NAICS 325110 - Petrochemical Manufacturing
SIC 2869 - Industrial Organic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 39,921
Annual Production 27,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,969,780 19,697,804 kWh $0.10
Electricity Demand $270,574 27,057 kW-months/year $10.00
Natural Gas $1,175,529 223,060 MMBtu $5.27
TOTAL ENERGY COSTS $3,415,883
RECOMMENDED SAVINGS* $228,444 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $54,393
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$94,284
Cost:
$46,620
$82,894 828,942 $11,390 1,139 - - $82,894
828,942
kWh
$11,390
1,139
kW-months/year
-
-
MMBtu
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$44,472
Cost:
$19,980
$39,102 391,023 $5,370 537 - - $39,102
391,023
kWh
$5,370
537
kW-months/year
-
-
MMBtu
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$38,910
Cost:
$2,520
- - - - $38,910 6,814 -
-
kWh
-
-
kW-months/year
$38,910
6,814
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$31,498
Cost:
$6,660
$27,698 276,975 $3,800 380 - - $27,698
276,975
kWh
$3,800
380
kW-months/year
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$10,363
Cost:
$1,660
$9,113 91,132 $1,250 125 - - $9,113
91,132
kWh
$1,250
125
kW-months/year
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,797
Cost:
$2,726
$3,337 33,371 $460 46 - - $3,337
33,371
kWh
$460
46
kW-months/year
-
-
MMBtu
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,893
Cost:
$80
$2,543 25,427 $350 35 - - $2,543
25,427
kWh
$350
35
kW-months/year
-
-
MMBtu
08: 2.7145 INSTALL SKYLIGHTS Savings:
$2,227
Cost:
$960
$1,747 17,472 $480 48 - - $1,747
17,472
kWh
$480
48
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$228,444
Cost:
$81,206
$166,434 1,664,342 $23,100 2,310 $38,910 6,814 $166,434
1,664,342
kWh
$23,100
2,310
kW-months/year
$38,910
6,814
MMBtu
TOTAL IMPLEMENTED Savings:
$54,393
Cost:
$5,220
$13,403 134,031 $2,080 208 $38,910 6,814 $13,403
134,031
kWh
$2,080
208
kW-months/year
$38,910
6,814
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas