IAC logo
IAC Assessment: MI0224
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0224
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2012
Principal Product Plastic Bags
NAICS 326111 - Plastics Bag and Pouch Manufacturing
SIC 2673 - Bags: Plastics, Laminated, & Coated
Sales $10,000,000-$50,000,000
# of Employees 48
Plant Area (Sq.Ft.) 51,000
Annual Production 17,000,000 Pounds
Production Hrs. Annual 8,736
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $406,873 5,278,403 kWh $0.08
Electricity Demand $49,880 10,343 kW-months/year $4.82
Electricity Fees $39,297 - $ -
TOTAL ENERGY COSTS $496,051
RECOMMENDED SAVINGS* $57,520 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $41,246
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$20,266
Cost:
$11,960
$18,660 242,341 $1,606 333 $18,660
242,341
kWh
$1,606
333
kW-months/year
02: 2.2511 INSULATE BARE EQUIPMENT Savings:
$14,666
Cost:
$2,135
$13,156 170,857 $1,510 313 $13,156
170,857
kWh
$1,510
313
kW-months/year
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$6,947
Cost:
$12,324
$6,076 78,907 $871 181 $6,076
78,907
kWh
$871
181
kW-months/year
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,323
Cost:
$3,480
$4,901 63,648 $422 87 $4,901
63,648
kWh
$422
87
kW-months/year
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,130
Cost:
$1,660
$2,678 34,780 $452 94 $2,678
34,780
kWh
$452
94
kW-months/year
06: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$996
Cost:
$2,594
$919 11,937 $77 16 $919
11,937
kWh
$77
16
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,962
Cost:
$520
$1,808 23,483 $154 32 $1,808
23,483
kWh
$154
32
kW-months/year
08: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,668
Cost:
$80
$1,475 19,151 $193 40 $1,475
19,151
kWh
$193
40
kW-months/year
09: 2.7145 INSTALL SKYLIGHTS Savings:
$1,608
Cost:
$5,550
$1,354 17,597 $254 53 $1,354
17,597
kWh
$254
53
kW-months/year
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$954
Cost:
$1,230
$877 11,392 $77 16 $877
11,392
kWh
$77
16
kW-months/year
TOTAL RECOMMENDED Savings:
$57,520
Cost:
$41,533
$51,904 674,093 $5,616 1,165 $51,904
674,093
kWh
$5,616
1,165
kW-months/year
TOTAL IMPLEMENTED Savings:
$41,246
Cost:
$33,848
$37,394 485,639 $3,852 799 $37,394
485,639
kWh
$3,852
799
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand