IAC Assessment: MI0231
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0231
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2012
Principal Product Cosmetics
NAICS 322291 - Sanitary Paper Product Manufacturing
SIC 2676 - Sanitary Paper Products
Sales $1,000,000-$5,000,000
# of Employees 19
Plant Area (Sq.Ft.) 23,000
Annual Production 7,677,500 Pieces
Production Hrs. Annual 1,820
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $114,926 499,455 kWh $0.23
Electricity Demand $34,342 3,565 kW-months/year $9.63
Electricity Fees $19,201 - $ -
TOTAL ENERGY COSTS $168,469
RECOMMENDED SAVINGS* $96,071 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $79,841
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$30,009
Cost:
$1,800
$23,516 102,242 $6,493 674 - - $23,516
102,242
kWh
$6,493
674
kW-months/year
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$18,144
Cost:
$1,660
$17,367 75,507 $777 81 - - $17,367
75,507
kWh
$777
81
kW-months/year
-
-
$
03: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$13,801
Cost:
$480
- - - - $13,801 - -
-
kWh
-
-
kW-months/year
$13,801
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,235
Cost:
$2,050
$6,696 29,110 $539 56 - - $6,696
29,110
kWh
$539
56
kW-months/year
-
-
$
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$6,801
Cost:
$800
$5,329 23,168 $1,472 153 - - $5,329
23,168
kWh
$1,472
153
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$6,414
Cost:
$80
$5,547 24,116 $867 90 - - $5,547
24,116
kWh
$867
90
kW-months/year
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,040
Cost:
$4,550
- - $4,040 419 - - -
-
kWh
$4,040
419
kW-months/year
-
-
$
08: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,835
Cost:
$4,691
$3,480 15,132 $355 26 - - $3,480
15,132
kWh
$355
26
kW-months/year
-
-
$
09: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,123
Cost:
$1,160
$2,449 10,647 $674 70 - - $2,449
10,647
kWh
$674
70
kW-months/year
-
-
$
10: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$1,549
Cost:
$843
$1,212 5,271 $337 35 - - $1,212
5,271
kWh
$337
35
kW-months/year
-
-
$
11: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$1,120
Cost:
$1,498
$879 3,822 $241 25 - - $879
3,822
kWh
$241
25
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$96,071
Cost:
$19,612
$66,475 289,015 $15,795 1,629 $13,801 - $66,475
289,015
kWh
$15,795
1,629
kW-months/year
$13,801
-
$
TOTAL IMPLEMENTED Savings:
$79,841
Cost:
$6,823
$55,420 240,951 $10,620 1,103 $13,801 - $55,420
240,951
kWh
$10,620
1,103
kW-months/year
$13,801
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes