IAC logo
IAC Assessment: MI0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2013
Principal Product Surgical appliances and supplies
NAICS 339113 - Surgical Appliance and Supplies Manufacturing
SIC 3842 - Surgical Appliances And Supplies
Sales $100,000,000-$500,000,000
# of Employees 320
Plant Area (Sq.Ft.) 67,000
Annual Production 45 Pieces
Production Hrs. Annual 2,080
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $84,555 1,533,650 kWh $0.06
Electricity Demand $47,086 4,702 kW-months/year $10.01
Electricity Fees $32,831 - $ -
TOTAL ENERGY COSTS $164,472
RECOMMENDED SAVINGS* $59,009 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $55,394
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$16,509
Cost:
$3,900
$13,204 240,068 $3,305 330 $13,204
240,068
kWh
$3,305
330
kW-months/year
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$11,217
Cost:
$6,000
$5,449 99,856 $5,768 576 $5,449
99,856
kWh
$5,768
576
kW-months/year
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$9,040
Cost:
$80
$5,845 106,271 $3,195 319 $5,845
106,271
kWh
$3,195
319
kW-months/year
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$7,960
Cost:
$540
$6,368 115,789 $1,592 159 $6,368
115,789
kWh
$1,592
159
kW-months/year
05: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$3,883
Cost:
$4,691
$2,798 50,874 $1,085 108 $2,798
50,874
kWh
$1,085
108
kW-months/year
06: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,564
Cost:
$440
$570 10,356 $1,994 199 $570
10,356
kWh
$1,994
199
kW-months/year
07: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$2,118
Cost:
$5,397
$1,367 24,856 $751 75 $1,367
24,856
kWh
$751
75
kW-months/year
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,942
Cost:
$2,196
$947 17,233 $995 99 $947
17,233
kWh
$995
99
kW-months/year
09: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,593
Cost:
$1,660
$1,528 27,788 $65 6 $1,528
27,788
kWh
$65
6
kW-months/year
10: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$955
Cost:
$80
$694 12,615 $261 26 $694
12,615
kWh
$261
26
kW-months/year
11: 2.2511 INSULATE BARE EQUIPMENT Savings:
$686
Cost:
$1,520
$336 6,112 $350 35 $336
6,112
kWh
$350
35
kW-months/year
12: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$542
Cost:
$209
$262 4,766 $280 28 $262
4,766
kWh
$280
28
kW-months/year
TOTAL RECOMMENDED Savings:
$59,009
Cost:
$26,713
$39,368 716,584 $19,641 1,960 $39,368
716,584
kWh
$19,641
1,960
kW-months/year
TOTAL IMPLEMENTED Savings:
$55,394
Cost:
$21,027
$37,045 674,347 $18,349 1,831 $37,045
674,347
kWh
$18,349
1,831
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand