Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2013 |
Principal Product | Pharmacutical |
NAICS | 325998 - All Other Miscellaneous Chemical Product and Preparation Manufacturing |
SIC | 2899 - Chemical Preparations, Nec |
Sales | $50,000,000-$100,000,000 |
# of Employees | 100 |
Plant Area (Sq.Ft.) | 55,000 |
Annual Production | 300,000,000 Pieces |
Production Hrs. Annual | 6,240 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $184,859 | 3,622,324 | kWh | $0.05 |
Electricity Demand | $69,603 | 6,618 | kW-months/year | $10.52 |
Electricity Fees | $38,218 | - | $ | - |
Natural Gas | $36,500 | 8,178 | MMBtu | $4.46 |
TOTAL ENERGY COSTS | $329,181 | |||
RECOMMENDED SAVINGS* | $61,051 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $53,934 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $30,416 Cost: $2,300 |
$15,133 | 302,660 | $15,283 | 1,453 | - | - | - | - |
$15,133 302,660 kWh |
$15,283 1,453 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $14,747 Cost: $17,000 |
$9,340 | 186,816 | $5,407 | 514 | - | - | - | - |
$9,340 186,816 kWh |
$5,407 514 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $5,442 Cost: $1,660 |
$3,794 | 75,878 | $1,648 | 156 | - | - | - | - |
$3,794 75,878 kWh |
$1,648 156 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $2,851 Cost: $417 |
$2,022 | 40,272 | $829 | 79 | - | - | - | - |
$2,022 40,272 kWh |
$829 79 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $2,190 Cost: $2,520 |
- | - | - | - | $2,190 | 467 | - | - |
- - kWh |
- - kW-months/year |
$2,190 467 MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,076 Cost: $6,910 |
$1,292 | 25,846 | $784 | 75 | - | - | - | - |
$1,292 25,846 kWh |
$784 75 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,508 Cost: $4,420 |
$950 | 19,006 | $558 | 53 | - | - | - | - |
$950 19,006 kWh |
$558 53 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES |
Savings: $945 Cost: $240 |
- | - | - | - | - | - | $945 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$945 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $876 Cost: $80 |
$681 | 13,620 | $195 | 19 | - | - | - | - |
$681 13,620 kWh |
$195 19 kW-months/year |
- - MMBtu |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $61,051 Cost: $35,547 |
$33,212 | 664,098 | $24,704 | 2,349 | $2,190 | 467 | $945 | - | $33,212 664,098 kWh |
$24,704 2,349 kW-months/year |
$2,190 467 MMBtu |
$945 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $53,934 Cost: $25,700 |
$29,898 | 597,980 | $23,091 | 2,195 | - | - | $945 | - | $29,898 597,980 kWh |
$23,091 2,195 kW-months/year |
- - MMBtu |
$945 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Administrative Changes |