IAC logo
IAC Assessment: MI0248
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0248
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2013
Principal Product Furniture
NAICS 321918 - Other Millwork (including Flooring)
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 103
Plant Area (Sq.Ft.) 60,000
Annual Production 50,000 Pieces
Production Hrs. Annual 4,420
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $50,369 973,626 kWh $0.05
Electricity Demand $45,908 4,477 kW-months/year $10.25
Electricity Fees $18,824 - $ -
TOTAL ENERGY COSTS $115,102
RECOMMENDED SAVINGS* $32,400 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $18,858
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,983
Cost:
$30,489
$5,133 100,600 $2,850 278 - - $5,133
100,600
kWh
$2,850
278
kW-months/year
-
-
$
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,449
Cost:
$2,300
$3,774 75,482 $3,675 359 - - $3,774
75,482
kWh
$3,675
359
kW-months/year
-
-
$
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$6,335
Cost:
$440
$4,070 81,390 $2,265 221 - - $4,070
81,390
kWh
$2,265
221
kW-months/year
-
-
$
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$5,637
Cost:
$9,460
$3,620 72,407 $2,017 197 - - $3,620
72,407
kWh
$2,017
197
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,241
Cost:
$1,660
$399 7,999 $842 82 - - $399
7,999
kWh
$842
82
kW-months/year
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$1,180
Cost:
$80
$684 13,684 $496 48 - - $684
13,684
kWh
$496
48
kW-months/year
-
-
$
07: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,005
Cost:
$240
- - - - $1,005 - -
-
kWh
-
-
kW-months/year
$1,005
-
$
08: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$965
Cost:
$2,200
$606 12,127 $359 35 - - $606
12,127
kWh
$359
35
kW-months/year
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$605
Cost:
$209
$390 7,806 $215 21 - - $390
7,806
kWh
$215
21
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$32,400
Cost:
$47,078
$18,676 371,495 $12,719 1,241 $1,005 - $18,676
371,495
kWh
$12,719
1,241
kW-months/year
$1,005
-
$
TOTAL IMPLEMENTED Savings:
$18,858
Cost:
$34,769
$9,990 197,765 $7,863 767 $1,005 - $9,990
197,765
kWh
$7,863
767
kW-months/year
$1,005
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes