Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2014 |
Principal Product | Pharmacutical |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $10,000,000-$50,000,000 |
# of Employees | 55 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 1,000,000 Pieces |
Production Hrs. Annual | 3,744 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $207,693 | 4,863,600 | kWh | $0.04 |
Electricity Demand | $110,630 | 8,153 | kW-months/year | $13.57 |
Electricity Fees | $45,000 | - | $ | - |
Natural Gas | $78,473 | 12,016 | MMBtu | $6.53 |
TOTAL ENERGY COSTS | $441,797 | |||
RECOMMENDED SAVINGS* | $110,569 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $80,495 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $23,834 Cost: $20,160 |
$16,628 | 386,703 | $7,206 | 531 | - | - |
$16,628 386,703 kWh |
$7,206 531 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $23,626 Cost: $13,599 |
$16,495 | 383,601 | $7,131 | 525 | - | - |
$16,495 383,601 kWh |
$7,131 525 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $23,619 Cost: $80 |
$16,495 | 383,601 | $7,124 | 525 | - | - |
$16,495 383,601 kWh |
$7,124 525 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $14,420 Cost: $1,660 |
$8,698 | 202,273 | $5,722 | 421 | - | - |
$8,698 202,273 kWh |
$5,722 421 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $11,196 Cost: $3,960 |
- | - | - | - | $11,196 | 1,714 |
- - kWh |
- - kW-months/year |
$11,196 1,714 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $7,634 Cost: $80 |
$3,571 | 83,057 | $4,063 | 300 | - | - |
$3,571 83,057 kWh |
$4,063 300 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $3,540 Cost: $3,240 |
$2,468 | 57,346 | $1,072 | 79 | - | - |
$2,468 57,346 kWh |
$1,072 79 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,517 Cost: $3,360 |
$811 | 18,870 | $706 | 52 | - | - |
$811 18,870 kWh |
$706 52 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,183 Cost: $6,800 |
$586 | 13,628 | $597 | 44 | - | - |
$586 13,628 kWh |
$597 44 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $110,569 Cost: $52,939 |
$65,752 | 1,529,079 | $33,621 | 2,477 | $11,196 | 1,714 | $65,752 1,529,079 kWh |
$33,621 2,477 kW-months/year |
$11,196 1,714 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $80,495 Cost: $19,379 |
$45,259 | 1,052,532 | $24,040 | 1,771 | $11,196 | 1,714 | $45,259 1,052,532 kWh |
$24,040 1,771 kW-months/year |
$11,196 1,714 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |