Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2014 |
Principal Product | Boats |
NAICS | 336612 - Boat Building |
SIC | 3732 - Boat Building And Repairing |
Sales | $50,000,000-$100,000,000 |
# of Employees | 180 |
Plant Area (Sq.Ft.) | 100,000 |
Annual Production | 20 Pieces |
Production Hrs. Annual | 7,488 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $272,494 | 2,889,644 | kWh | $0.09 |
Electricity Demand | $56,597 | 8,194 | kW-months/year | $6.91 |
Electricity Fees | $41,482 | - | $ | - |
LPG | $5,031 | 150 | MMBtu | $33.65 |
TOTAL ENERGY COSTS | $446,344 | |||
RECOMMENDED SAVINGS* | $128,572 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $62,577 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $30,260 Cost: $87,618 |
$26,966 | 286,872 | $3,294 | 477 | - | - | - | - | - | - | - | - |
$26,966 286,872 kWh |
$3,294 477 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.8132 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES |
Savings: $15,579 Cost: $320 |
- | - | - | - | - | - | - | - | - | - | $15,579 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$15,579 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7134 USE PHOTOCELL CONTROLS |
Savings: $15,757 Cost: $840 |
$12,752 | 135,660 | $3,005 | 435 | - | - | - | - | - | - | - | - |
$12,752 135,660 kWh |
$3,005 435 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7145 INSTALL SKYLIGHTS |
Savings: $12,707 Cost: $1,600 |
$12,707 | 133,062 | - | - | - | - | - | - | - | - | - | - |
$12,707 133,062 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE |
Savings: $8,739 Cost: $2,100 |
- | - | - | - | - | - | - | - | $8,739 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$8,739 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $8,019 Cost: $80 |
$6,238 | 66,366 | $1,781 | 265 | - | - | - | - | - | - | - | - |
$6,238 66,366 kWh |
$1,781 265 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE |
Savings: $7,073 Cost: $1,000 |
- | - | - | - | - | - | $7,073 | 102,975 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$7,073 102,975 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.4222 INSTALL ADEQUATE DRYERS ON AIR LINES TO ELIMINATE BLOWDOWN |
Savings: $5,408 Cost: $140 |
$4,836 | 51,447 | $572 | 83 | - | - | - | - | - | - | - | - |
$4,836 51,447 kWh |
$572 83 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,031 Cost: $140 |
- | - | - | - | $5,031 | 150 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,031 150 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE |
Savings: $4,344 Cost: $4,800 |
$3,888 | 41,357 | $456 | 66 | - | - | - | - | - | - | - | - |
$3,888 41,357 kWh |
$456 66 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $2,707 Cost: $3,170 |
$2,422 | 25,765 | $285 | 41 | - | - | - | - | - | - | - | - |
$2,422 25,765 kWh |
$285 41 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT |
Savings: $2,115 Cost: $520 |
$1,894 | 20,149 | $221 | 32 | - | - | - | - | - | - | - | - |
$1,894 20,149 kWh |
$221 32 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $1,870 Cost: $2,960 |
- | - | - | - | $1,870 | 56 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,870 56 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
14: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,886 Cost: $1,660 |
$1,688 | 17,959 | $198 | 29 | - | - | - | - | - | - | - | - |
$1,688 17,959 kWh |
$198 29 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
15: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,646 Cost: $1,660 |
$1,473 | 15,672 | $173 | 25 | - | - | - | - | - | - | - | - |
$1,473 15,672 kWh |
$173 25 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
16: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,316 Cost: $80 |
$1,178 | 12,537 | $138 | 20 | - | - | - | - | - | - | - | - |
$1,178 12,537 kWh |
$138 20 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
17: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $1,179 Cost: $80 |
$1,055 | 11,224 | $124 | 18 | - | - | - | - | - | - | - | - |
$1,055 11,224 kWh |
$124 18 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
18: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $1,127 Cost: $80 |
$1,010 | 10,745 | $117 | 17 | - | - | - | - | - | - | - | - |
$1,010 10,745 kWh |
$117 17 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
19: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $782 Cost: $1,660 |
$699 | 7,438 | $83 | 12 | - | - | - | - | - | - | - | - |
$699 7,438 kWh |
$83 12 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
20: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $542 Cost: $83 |
$487 | 5,176 | $55 | 8 | - | - | - | - | - | - | - | - |
$487 5,176 kWh |
$55 8 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
21: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $485 Cost: $80 |
$437 | 4,649 | $48 | 7 | - | - | - | - | - | - | - | - |
$437 4,649 kWh |
$48 7 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $128,572 Cost: $110,671 |
$79,730 | 846,078 | $10,550 | 1,535 | $6,901 | 205 | $7,073 | 102,975 | $8,739 | - | $15,579 | - | $79,730 846,078 kWh |
$10,550 1,535 kW-months/year |
$6,901 205 MMBtu |
$7,073 102,975 lb |
$8,739 - $ |
$15,579 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $62,577 Cost: $12,540 |
$48,719 | 516,178 | $6,785 | 990 | - | - | $7,073 | 102,975 | - | - | - | - | $48,719 516,178 kWh |
$6,785 990 kW-months/year |
- - MMBtu |
$7,073 102,975 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | LPG | Solid Waste (non-haz) | Administrative Changes | Ancillary Material Cost |