IAC logo
IAC Assessment: MI0296
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0296
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2016
Principal Product Stainless Steel Pipe
NAICS 331210 - Iron and Steel Pipe and Tube Manufacturing from Purchased Steel
SIC 3317 - Steel Pipe And Tubes
Sales $10,000,000-$50,000,000
# of Employees 74
Plant Area (Sq.Ft.) 200,000
Annual Production 6,000 Tons
Production Hrs. Annual 4,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $270,644 4,786,200 kWh $0.06
Electricity Demand $207,107 19,374 kW-months/year $10.69
Electricity Fees $48,517 - $ -
TOTAL ENERGY COSTS $526,267
RECOMMENDED SAVINGS* $98,094 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $59,343
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Consumption Electricity Usage Electricity Demand Water Consumption
$ kWh $ kW-months/year $ Tgal
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$23,090
Cost:
$560
- - $23,090 2,160 - - -
-
kWh
$23,090
2,160
kW-months/year
-
-
Tgal
02: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$17,090
Cost:
$208
$17,090 299,829 - - - - $17,090
299,829
kWh
-
-
kW-months/year
-
-
Tgal
03: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$14,550
Cost:
$40
$12,123 212,688 $2,427 227 - - $12,123
212,688
kWh
$2,427
227
kW-months/year
-
-
Tgal
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$13,501
Cost:
$21,680
$8,637 151,525 $4,864 455 - - $8,637
151,525
kWh
$4,864
455
kW-months/year
-
-
Tgal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$11,548
Cost:
$1,660
$10,791 189,308 $757 71 - - $10,791
189,308
kWh
$757
71
kW-months/year
-
-
Tgal
06: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$9,937
Cost:
$4,464
$6,359 111,566 $3,578 335 - - $6,359
111,566
kWh
$3,578
335
kW-months/year
-
-
Tgal
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,576
Cost:
$2,520
$2,293 40,227 $1,283 120 - - $2,293
40,227
kWh
$1,283
120
kW-months/year
-
-
Tgal
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,616
Cost:
$2,240
$1,616 28,355 - - - - $1,616
28,355
kWh
-
-
kW-months/year
-
-
Tgal
09: 3.4151 MINIMIZE WATER USAGE Savings:
$970
Cost:
$2,200
- - - - $970 - -
-
kWh
-
-
kW-months/year
$970
-
Tgal
10: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$926
Cost:
$40
$926 16,235 - - - - $926
16,235
kWh
-
-
kW-months/year
-
-
Tgal
11: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$746
Cost:
$440
$393 6,902 $353 33 - - $393
6,902
kWh
$353
33
kW-months/year
-
-
Tgal
12: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$544
Cost:
$2,357
$202 3,542 $342 32 - - $202
3,542
kWh
$342
32
kW-months/year
-
-
Tgal
TOTAL RECOMMENDED Savings:
$98,094
Cost:
$38,409
$60,430 1,060,177 $36,694 3,433 $970 - $60,430
1,060,177
kWh
$36,694
3,433
kW-months/year
$970
-
Tgal
TOTAL IMPLEMENTED Savings:
$59,343
Cost:
$11,572
$49,975 876,755 $8,398 786 $970 - $49,975
876,755
kWh
$8,398
786
kW-months/year
$970
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Consumption Electricity Usage Electricity Demand Water Consumption