IAC logo
IAC Assessment: MI0297
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0297
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2016
Principal Product Automotive parts
NAICS 336390 - Other Motor Vehicle Parts Manufacturing
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $50,000,000-$100,000,000
# of Employees 130
Plant Area (Sq.Ft.) 250,000
Annual Production 44,400,000 Pieces
Production Hrs. Annual 6,000
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $332,783 5,460,000 kWh $0.06
Electricity Demand $152,624 12,240 kW-months/year $12.47
Electricity Fees $38,159 - $ -
Natural Gas $17,722 1,555 MMBtu $11.39
TOTAL ENERGY COSTS $541,289
RECOMMENDED SAVINGS* $341,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $67,406
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$97,105
Cost:
$82,600
$146,274 2,397,928 $59,801 4,796 $(-108,970) (-9,563) - - $146,274
2,397,928
kWh
$59,801
4,796
kW-months/year
$(-108,970)
(-9,563)
MMBtu
-
-
$
02: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$65,063
Cost:
$200,000
$30,534 500,551 $8,529 684 - - $26,000 - $30,534
500,551
kWh
$8,529
684
kW-months/year
-
-
MMBtu
$26,000
-
$
03: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$40,957
Cost:
$1,120
$40,957 671,420 - - - - - - $40,957
671,420
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$27,925
Cost:
$1,400
$19,820 324,921 $8,105 650 - - - - $19,820
324,921
kWh
$8,105
650
kW-months/year
-
-
MMBtu
-
-
$
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$23,144
Cost:
$7,000
$16,411 269,029 $6,733 538 - - - - $16,411
269,029
kWh
$6,733
538
kW-months/year
-
-
MMBtu
-
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$21,747
Cost:
$40
$15,438 253,076 $6,309 506 - - - - $15,438
253,076
kWh
$6,309
506
kW-months/year
-
-
MMBtu
-
-
$
07: 2.7496 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE Savings:
$21,352
Cost:
$22,281
$21,352 350,035 - - - - - - $21,352
350,035
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$21,133
Cost:
$1,660
$17,946 294,189 $3,187 256 - - - - $17,946
294,189
kWh
$3,187
256
kW-months/year
-
-
MMBtu
-
-
$
09: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$9,631
Cost:
$16,156
$6,165 101,073 $3,466 278 - - - - $6,165
101,073
kWh
$3,466
278
kW-months/year
-
-
MMBtu
-
-
$
10: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$5,934
Cost:
$10,031
$4,212 69,053 $1,722 138 - - - - $4,212
69,053
kWh
$1,722
138
kW-months/year
-
-
MMBtu
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,116
Cost:
$884
$5,116 83,862 - - - - - - $5,116
83,862
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
12: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,442
Cost:
$2,628
$1,442 23,638 - - - - - - $1,442
23,638
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
13: 2.7134 USE PHOTOCELL CONTROLS Savings:
$781
Cost:
$240
$781 12,000 - - - - - - $781
12,000
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
14: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$335
Cost:
$944
$208 3,407 $127 10 - - - - $208
3,407
kWh
$127
10
kW-months/year
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$341,665
Cost:
$346,984
$326,656 5,354,182 $97,979 7,856 $(-108,970) (-9,563) $26,000 - $326,656
5,354,182
kWh
$97,979
7,856
kW-months/year
$(-108,970)
(-9,563)
MMBtu
$26,000
-
$
TOTAL IMPLEMENTED Savings:
$67,406
Cost:
$34,513
$57,359 940,298 $10,047 804 - - - - $57,359
940,298
kWh
$10,047
804
kW-months/year
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Administrative Changes Electricity Usage Electricity Demand Natural Gas Administrative Changes