IAC Assessment: MI0325
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0325
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2017
Principal Product Electroplating
NAICS 332813 - Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471 - Plating And Polishing
Sales $1,000,000-$5,000,000
# of Employees 65
Plant Area (Sq.Ft.) 69,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 2,730
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $216,905 1,201,360 kWh $0.18
Electricity Demand $55,368 6,836 kW-months/year $8.10
Electricity Fees $3,262 - $ -
Fuel Oil #2 $120,483 8,016 MMBtu $15.03
TOTAL ENERGY COSTS $396,017
RECOMMENDED SAVINGS* $62,331 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,716
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2
$ kWh $ kW-months/year $ MMBtu
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$27,225
Cost:
$14,854
$22,750 125,689 $4,475 552 - - $22,750
125,689
kWh
$4,475
552
kW-months/year
-
-
MMBtu
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$9,604
Cost:
$1,660
$8,786 48,544 $818 101 - - $8,786
48,544
kWh
$818
101
kW-months/year
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$7,332
Cost:
$4,841
$6,127 33,852 $1,205 149 - - $6,127
33,852
kWh
$1,205
149
kW-months/year
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$7,058
Cost:
$9,700
- - - - $7,058 470 -
-
kWh
-
-
kW-months/year
$7,058
470
MMBtu
05: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$3,801
Cost:
$160
$3,177 17,554 $624 77 - - $3,177
17,554
kWh
$624
77
kW-months/year
-
-
MMBtu
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$2,645
Cost:
$2,520
- - - - $2,645 176 -
-
kWh
-
-
kW-months/year
$2,645
176
MMBtu
07: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$2,220
Cost:
$1,600
$1,855 10,248 $365 45 - - $1,855
10,248
kWh
$365
45
kW-months/year
-
-
MMBtu
08: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$1,467
Cost:
$388
- - - - $1,467 98 -
-
kWh
-
-
kW-months/year
$1,467
98
MMBtu
09: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$979
Cost:
$3,042
$817 4,515 $162 20 - - $817
4,515
kWh
$162
20
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$62,331
Cost:
$38,765
$43,512 240,402 $7,649 944 $11,170 743 $43,512
240,402
kWh
$7,649
944
kW-months/year
$11,170
743
MMBtu
TOTAL IMPLEMENTED Savings:
$20,716
Cost:
$9,370
$14,635 80,861 $1,969 243 $4,112 274 $14,635
80,861
kWh
$1,969
243
kW-months/year
$4,112
274
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Fuel Oil #2 Electricity Usage Electricity Demand Fuel Oil #2