IAC logo
IAC Assessment: MI0331
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0331
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2018
Principal Product Plastic Pipes
NAICS 326122 - Plastics Pipe and Pipe Fitting Manufacturing
SIC 3084 - Plastics Pipe
Sales $50,000,000-$100,000,000
# of Employees 40
Plant Area (Sq.Ft.) 42,000
Annual Production 8,000 Thousand Feet
Production Hrs. Annual 6,420
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $264,127 4,579,600 kWh $0.06
Electricity Demand $97,879 10,096 kW-months/year $9.69
Electricity Fees $50,142 - $ -
Fuel Oil #2 $183,440 8,797 MMBtu $20.85
TOTAL ENERGY COSTS $625,748
RECOMMENDED SAVINGS* $42,017 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,597
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$12,963
Cost:
$15,690
- - - - - - $12,963 176,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,963
176,000
lb
-
-
$
02: 2.8226 INCREASE EFFICIENCY OF TRUCKS Savings:
$6,044
Cost:
$5,800
- - - - $2,294 110 - - $3,750 - -
-
kWh
-
-
kW-months/year
$2,294
110
MMBtu
-
-
lb
$3,750
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$5,170
Cost:
$2,020
$3,915 67,505 $1,255 129 - - - - - - $3,915
67,505
kWh
$1,255
129
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$4,461
Cost:
-
- - - - - - - - $4,461 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$4,461
-
$
05: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$4,250
Cost:
$1,400
$4,250 73,274 - - - - - - - - $4,250
73,274
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,515
Cost:
$4,841
$2,515 43,368 - - - - - - - - $2,515
43,368
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,868
Cost:
$531
$1,412 24,339 $456 47 - - - - - - $1,412
24,339
kWh
$456
47
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
08: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,823
Cost:
$340
$1,469 25,331 $354 37 - - - - - - $1,469
25,331
kWh
$354
37
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
09: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,540
Cost:
$480
$688 11,866 $852 88 - - - - - - $688
11,866
kWh
$852
88
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
10: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$962
Cost:
$2,525
$430 7,406 $532 55 - - - - - - $430
7,406
kWh
$532
55
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
11: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$420
Cost:
$1,875
$226 3,903 $194 20 - - - - - - $226
3,903
kWh
$194
20
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$42,017
Cost:
$35,502
$14,906 256,992 $3,643 376 $2,294 110 $12,963 176,000 $8,211 - $14,906
256,992
kWh
$3,643
376
kW-months/year
$2,294
110
MMBtu
$12,963
176,000
lb
$8,211
-
$
TOTAL IMPLEMENTED Savings:
$24,597
Cost:
$21,970
$5,595 96,449 $1,578 163 - - $12,963 176,000 $4,461 - $5,595
96,449
kWh
$1,578
163
kW-months/year
-
-
MMBtu
$12,963
176,000
lb
$4,461
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #2 Solid Waste (non-haz) Administrative Changes