Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2018 |
Principal Product | Aluminum Accessories |
NAICS | 332313 - Plate Work Manufacturing |
SIC | 3443 - Fabricated Plate Work (boiler Shops) |
Sales | $10,000,000-$50,000,000 |
# of Employees | 110 |
Plant Area (Sq.Ft.) | 74,000 |
Annual Production | 8,000 Pieces |
Production Hrs. Annual | 2,210 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $37,692 | 468,910 | kWh | $0.08 |
Electricity Demand | $12,395 | 1,254 | kW-months/year | $9.88 |
Electricity Fees | $6,496 | - | $ | - |
Natural Gas | $28,079 | 2,183 | MMBtu | $12.86 |
Fuel Oil #2 | $14,490 | 876 | MMBtu | $16.55 |
TOTAL ENERGY COSTS | $99,151 | |||
RECOMMENDED SAVINGS* | $20,233 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $20,233 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE |
Savings: $4,545 Cost: $3,280 |
$4,545 | 56,818 | - | - | - | - |
$4,545 56,818 kWh |
- - kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,167 Cost: $8,063 |
$2,714 | 33,930 | $1,453 | 147 | - | - |
$2,714 33,930 kWh |
$1,453 147 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $2,894 Cost: $2,030 |
$2,012 | 25,147 | $882 | 89 | - | - |
$2,012 25,147 kWh |
$882 89 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,798 Cost: $7,385 |
- | - | - | - | $2,798 | 218 |
- - kWh |
- - kW-months/year |
$2,798 218 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT |
Savings: $1,932 Cost: $7,536 |
$914 | 11,425 | $1,018 | 103 | - | - |
$914 11,425 kWh |
$1,018 103 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.431 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY |
Savings: $1,505 Cost: $480 |
- | - | - | - | $1,505 | 117 |
- - kWh |
- - kW-months/year |
$1,505 117 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $1,235 Cost: $2,520 |
- | - | - | - | $1,235 | 96 |
- - kWh |
- - kW-months/year |
$1,235 96 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,157 Cost: $5,370 |
- | - | - | - | $1,157 | 90 |
- - kWh |
- - kW-months/year |
$1,157 90 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $20,233 Cost: $36,664 |
$10,185 | 127,320 | $3,353 | 339 | $6,695 | 521 | $10,185 127,320 kWh |
$3,353 339 kW-months/year |
$6,695 521 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $20,233 Cost: $36,664 |
$10,185 | 127,320 | $3,353 | 339 | $6,695 | 521 | $10,185 127,320 kWh |
$3,353 339 kW-months/year |
$6,695 521 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Electricity Usage | Electricity Demand | Natural Gas |