IAC Assessment: MI0339
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0339
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2018
Principal Product Pharmaceuticals
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $100,000,000-$500,000,000
# of Employees 360
Plant Area (Sq.Ft.) 236,000
Annual Production 2,600,000,000 Pieces
Production Hrs. Annual 6,240
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,528,881 21,357,534 kWh $0.17
Electricity Demand $302,032 39,225 kW-months/year $7.70
Electricity Fees $5,400 - $ -
Natural Gas $262,800 21,900 MMBtu $12.00
TOTAL ENERGY COSTS $4,099,113
RECOMMENDED SAVINGS* $1,974,187 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,353,527
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.3415 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT Savings:
$1,225,133
Cost:
$10,935,180
$854,853 5,180,927 $54,647 7,097 $315,633 - $854,853
5,180,927
kWh
$54,647
7,097
kW-months/year
$315,633
-
$
02: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$279,023
Cost:
$250,000
$262,260 1,589,460 $16,763 2,177 - - $262,260
1,589,460
kWh
$16,763
2,177
kW-months/year
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$254,041
Cost:
$3,280
$254,041 1,539,641 - - - - $254,041
1,539,641
kWh
-
-
kW-months/year
-
-
$
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$95,116
Cost:
$69,861
$86,300 523,030 $8,816 1,145 - - $86,300
523,030
kWh
$8,816
1,145
kW-months/year
-
-
$
05: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$47,520
Cost:
$480
$44,663 270,684 $2,857 371 - - $44,663
270,684
kWh
$2,857
371
kW-months/year
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$33,278
Cost:
$2,030
$31,278 189,564 $2,000 260 - - $31,278
189,564
kWh
$2,000
260
kW-months/year
-
-
$
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$28,281
Cost:
$41,300
- - $28,281 3,673 - - -
-
kWh
$28,281
3,673
kW-months/year
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$11,795
Cost:
$9,000
$10,609 64,297 $1,186 154 - - $10,609
64,297
kWh
$1,186
154
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$1,974,187
Cost:
$11,311,131
$1,544,004 9,357,603 $114,550 14,877 $315,633 - $1,544,004
9,357,603
kWh
$114,550
14,877
kW-months/year
$315,633
-
$
TOTAL IMPLEMENTED Savings:
$1,353,527
Cost:
$11,007,071
$972,431 5,893,521 $65,463 8,502 $315,633 - $972,431
5,893,521
kWh
$65,463
8,502
kW-months/year
$315,633
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes