IAC logo
IAC Assessment: MI0341
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0341
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2018
Principal Product Apparel
NAICS 315190 - Other Apparel Knitting Mills
SIC 2254 - Knit Underwear Mills
Sales $10,000,000-$50,000,000
# of Employees 212
Plant Area (Sq.Ft.) 141,000
Annual Production 110,000 Pieces
Production Hrs. Annual 8,568
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,432,885 8,073,604 kWh $0.18
Electricity Demand $146,636 15,177 kW-months/year $9.66
Electricity Fees $2,400 - $ -
LPG $40,877 1,086 MMBtu $37.64
Fuel Oil #4 $635,460 56,244 MMBtu $11.30
TOTAL ENERGY COSTS $2,258,258
RECOMMENDED SAVINGS* $577,462 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #4 Administrative Changes Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #4 Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$142,227
Cost:
$2,030
$132,130 746,499 $10,097 1,045 - - - - - - - - $132,130
746,499
kWh
$10,097
1,045
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$75,087
Cost:
$115,295
- - - - - - - - $75,087 6,645 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$75,087
6,645
MMBtu
-
-
$
03: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$69,002
Cost:
$300,000
$51,560 291,301 $3,942 408 - - - - - - $13,500 - $51,560
291,301
kWh
$3,942
408
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
$13,500
-
$
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$59,009
Cost:
$48,268
$48,046 271,447 $10,963 1,135 - - - - - - - - $48,046
271,447
kWh
$10,963
1,135
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$49,949
Cost:
$6,410
$46,403 262,165 $3,546 367 - - - - - - - - $46,403
262,165
kWh
$3,546
367
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$49,910
Cost:
$35,323
$45,987 259,815 $3,923 406 - - - - - - - - $45,987
259,815
kWh
$3,923
406
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$45,466
Cost:
$38,639
$42,239 238,637 $3,227 334 - - - - - - - - $42,239
238,637
kWh
$3,227
334
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
08: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$39,872
Cost:
$3,380
$37,041 209,272 $2,831 293 - - - - - - - - $37,041
209,272
kWh
$2,831
293
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
09: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$24,956
Cost:
$7,314
$23,188 131,006 $1,768 183 - - - - - - - - $23,188
131,006
kWh
$1,768
183
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
10: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$17,936
Cost:
$25,045
- - - - $17,936 - - - - - - - -
-
kWh
-
-
kW-months/year
$17,936
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
11: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,246
Cost:
$2,109
$2,525 14,266 $721 75 - - - - - - - - $2,525
14,266
kWh
$721
75
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
12: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$803
Cost:
$1,560
- - - - - - $803 21 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$803
21
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$577,462
Cost:
$585,373
$429,119 2,424,408 $41,017 4,245 $17,936 - $803 21 $75,087 6,645 $13,500 - $429,119
2,424,408
kWh
$41,017
4,245
kW-months/year
$17,936
-
$
$803
21
MMBtu
$75,087
6,645
MMBtu
$13,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #4 Administrative Changes Electricity Usage Electricity Demand Electricity Fees LPG Fuel Oil #4 Administrative Changes