IAC Assessment: MI0345
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2018
Principal Product Processed Meat
NAICS 311612 - Meat Processed from Carcasses
SIC 2013 - Sausages And Other Prepared Meats
Sales $1,000,000-$5,000,000
# of Employees 25
Plant Area (Sq.Ft.) 29,000
Annual Production 1,280,000 Pounds
Production Hrs. Annual 2,340
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $58,446 318,780 kWh $0.18
Electricity Demand $11,700 1,033 kW-months/year $11.33
Electricity Fees $2,529 - $ -
LPG $14,329 712 MMBtu $20.13
Fuel Oil #2 $35,949 1,459 MMBtu $24.64
TOTAL ENERGY COSTS $122,953
RECOMMENDED SAVINGS* $22,933 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,928
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$7,969
Cost:
$3,100
$7,969 43,545 - - - - - - $7,969
43,545
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$6,837
Cost:
$3,204
$5,786 31,617 $1,051 93 - - - - $5,786
31,617
kWh
$1,051
93
kW-months/year
-
-
$
-
-
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,576
Cost:
$3,443
$2,259 12,345 $317 28 - - - - $2,259
12,345
kWh
$317
28
kW-months/year
-
-
$
-
-
MMBtu
04: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,410
Cost:
$1,982
- - - - - - $1,410 70 -
-
kWh
-
-
kW-months/year
-
-
$
$1,410
70
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$1,380
Cost:
$540
$1,153 6,303 $227 20 - - - - $1,153
6,303
kWh
$227
20
kW-months/year
-
-
$
-
-
MMBtu
06: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$1,166
Cost:
$2,755
$883 4,824 $283 25 - - - - $883
4,824
kWh
$283
25
kW-months/year
-
-
$
-
-
MMBtu
07: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$810
Cost:
$2,138
- - - - $810 - - - -
-
kWh
-
-
kW-months/year
$810
-
$
-
-
MMBtu
08: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$785
Cost:
$1,560
- - - - - - $785 39 -
-
kWh
-
-
kW-months/year
-
-
$
$785
39
MMBtu
TOTAL RECOMMENDED Savings:
$22,933
Cost:
$18,722
$18,050 98,634 $1,878 166 $810 - $2,195 109 $18,050
98,634
kWh
$1,878
166
kW-months/year
$810
-
$
$2,195
109
MMBtu
TOTAL IMPLEMENTED Savings:
$19,928
Cost:
$13,042
$18,050 98,634 $1,878 166 - - - - $18,050
98,634
kWh
$1,878
166
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees LPG Electricity Usage Electricity Demand Electricity Fees LPG