IAC logo
IAC Assessment: MI0354
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0354
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2019
Principal Product Washers and Eyelets
NAICS 332722 - Bolt, Nut, Screw, Rivet, and Washer Manufacturing
SIC 3452 - Bolts, Nuts, Rivets, And Washers
Sales $10,000,000-$50,000,000
# of Employees 212
Plant Area (Sq.Ft.) 278,000
Annual Production 1,500,000,000 Pieces
Production Hrs. Annual 2,040
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $143,688 3,253,600 kWh $0.04
Electricity Demand $183,963 13,988 kW-months/year $13.15
Electricity Fees $74,440 - $ -
Natural Gas $9,400 949 MMBtu $9.91
TOTAL ENERGY COSTS $411,491
RECOMMENDED SAVINGS* $99,183 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $87,320
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas
$ kWh $ kW-months/year $ MMBtu
01: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$42,517
Cost:
$105,476
$18,937 430,386 $23,580 1,793 - - $18,937
430,386
kWh
$23,580
1,793
kW-months/year
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$23,459
Cost:
$80,434
$8,506 193,329 $14,953 1,137 - - $8,506
193,329
kWh
$14,953
1,137
kW-months/year
-
-
MMBtu
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$12,789
Cost:
$3,600
$12,789 290,664 - - - - $12,789
290,664
kWh
-
-
kW-months/year
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$11,262
Cost:
$29,820
$4,082 92,779 $7,180 546 - - $4,082
92,779
kWh
$7,180
546
kW-months/year
-
-
MMBtu
05: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$2,590
Cost:
$8,800
$1,393 31,660 $1,197 91 - - $1,393
31,660
kWh
$1,197
91
kW-months/year
-
-
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,156
Cost:
$2,559
$2,156 49,006 - - - - $2,156
49,006
kWh
-
-
kW-months/year
-
-
MMBtu
07: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$1,687
Cost:
$240
$753 17,107 $934 71 - - $753
17,107
kWh
$934
71
kW-months/year
-
-
MMBtu
08: 2.7134 USE PHOTOCELL CONTROLS Savings:
$1,366
Cost:
$2,206
$498 11,318 $868 66 - - $498
11,318
kWh
$868
66
kW-months/year
-
-
MMBtu
09: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$601
Cost:
$2,205
- - - - $601 61 -
-
kWh
-
-
kW-months/year
$601
61
MMBtu
10: 2.7492 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE Savings:
$538
Cost:
$951
$196 4,455 $342 26 - - $196
4,455
kWh
$342
26
kW-months/year
-
-
MMBtu
11: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$218
Cost:
$559
$100 2,280 $118 9 - - $100
2,280
kWh
$118
9
kW-months/year
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$99,183
Cost:
$236,850
$49,410 1,122,984 $49,172 3,739 $601 61 $49,410
1,122,984
kWh
$49,172
3,739
kW-months/year
$601
61
MMBtu
TOTAL IMPLEMENTED Savings:
$87,320
Cost:
$204,825
$45,328 1,030,205 $41,992 3,193 - - $45,328
1,030,205
kWh
$41,992
3,193
kW-months/year
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ MMBtu
Electricity Usage Electricity Demand Natural Gas Electricity Usage Electricity Demand Natural Gas