Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2019 |
Principal Product | Pharmaceutical Products |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $100,000,000-$500,000,000 |
# of Employees | 400 |
Plant Area (Sq.Ft.) | 500,000 |
Annual Production | 3,000,000,000 Pieces |
Production Hrs. Annual | 8,736 |
Location (State) | PR |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $4,442,654 | 25,381,322 | kWh | $0.18 |
Electricity Demand | $330,327 | 40,963 | kW-months/year | $8.06 |
Electricity Fees | $122,504 | - | $ | - |
LPG | $1,592,637 | 96,459 | MMBtu | $16.51 |
TOTAL ENERGY COSTS | $6,488,122 | |||
RECOMMENDED SAVINGS* | $1,536,664 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $1,148,258 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | LPG | Electricity Usage | Electricity Demand | LPG | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL |
Savings: $547,956 Cost: $675,600 |
$515,337 | 2,944,783 | $32,619 | 4,045 | - | - |
$515,337 2,944,783 kWh |
$32,619 4,045 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD |
Savings: $281,283 Cost: $181,281 |
$264,542 | 1,511,669 | $16,741 | 2,076 | - | - |
$264,542 1,511,669 kWh |
$16,741 2,076 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM |
Savings: $182,349 Cost: $33,814 |
$171,495 | 979,974 | $10,854 | 1,346 | - | - |
$171,495 979,974 kWh |
$10,854 1,346 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $128,514 Cost: $60,610 |
- | - | - | - | $128,514 | 7,784 |
- - kWh |
- - kW-months/year |
$128,514 7,784 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $67,825 Cost: $25,283 |
$63,785 | 364,483 | $4,040 | 501 | - | - |
$63,785 364,483 kWh |
$4,040 501 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $59,287 Cost: $960 |
- | - | - | - | $59,287 | 3,591 |
- - kWh |
- - kW-months/year |
$59,287 3,591 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $53,837 Cost: $1,980 |
$50,636 | 289,347 | $3,201 | 397 | - | - |
$50,636 289,347 kWh |
$3,201 397 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.1243 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER |
Savings: $52,238 Cost: $52,238 |
- | - | - | - | $52,238 | 3,164 |
- - kWh |
- - kW-months/year |
$52,238 3,164 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT |
Savings: $47,169 Cost: $115,295 |
- | - | - | - | $47,169 | 2,857 |
- - kWh |
- - kW-months/year |
$47,169 2,857 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $33,548 Cost: $29,934 |
- | - | - | - | $33,548 | 2,032 |
- - kWh |
- - kW-months/year |
$33,548 2,032 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $32,799 Cost: $160 |
$30,848 | 176,277 | $1,951 | 242 | - | - |
$30,848 176,277 kWh |
$1,951 242 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $26,313 Cost: $7,820 |
$24,579 | 140,450 | $1,734 | 215 | - | - |
$24,579 140,450 kWh |
$1,734 215 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
13: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $23,546 Cost: $480 |
$22,199 | 126,849 | $1,347 | 167 | - | - |
$22,199 126,849 kWh |
$1,347 167 kW-months/year |
- - MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $1,536,664 Cost: $1,185,455 |
$1,143,421 | 6,533,832 | $72,487 | 8,989 | $320,756 | 19,428 | $1,143,421 6,533,832 kWh |
$72,487 8,989 kW-months/year |
$320,756 19,428 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $1,148,258 Cost: $894,115 |
$1,024,209 | 5,852,622 | $64,762 | 8,031 | $59,287 | 3,591 | $1,024,209 5,852,622 kWh |
$64,762 8,031 kW-months/year |
$59,287 3,591 MMBtu |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | LPG | Electricity Usage | Electricity Demand | LPG |