IAC Assessment: MI0363
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0363
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2019
Principal Product Mattresses
NAICS 337910 - Mattress Manufacturing
SIC 2515 - Mattresses And Bedsprings
Sales $10,000,000-$50,000,000
# of Employees 135
Plant Area (Sq.Ft.) 234,000
Annual Production 520,000 Pieces
Production Hrs. Annual 6,240
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,022 3,031,960 kWh $0.04
Electricity Demand $71,226 5,374 kW-months/year $13.25
Electricity Fees $45,698 - $ -
TOTAL ENERGY COSTS $250,946
RECOMMENDED SAVINGS* $136,070 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $70,297
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$61,551
Cost:
$246,817
$43,539 989,531 $18,012 1,359 - - $43,539
989,531
kWh
$18,012
1,359
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$38,089
Cost:
$74,297
$24,119 548,155 $13,970 1,054 - - $24,119
548,155
kWh
$13,970
1,054
kW-months/year
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$22,037
Cost:
$3,600
$22,037 500,833 - - - - $22,037
500,833
kWh
-
-
kW-months/year
-
-
$
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,025
Cost:
$120
$5,679 129,062 $2,346 177 - - $5,679
129,062
kWh
$2,346
177
kW-months/year
-
-
$
05: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$2,859
Cost:
-
- - - - $2,859 - -
-
kWh
-
-
kW-months/year
$2,859
-
$
06: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,363
Cost:
$2,005
$859 19,514 $504 38 - - $859
19,514
kWh
$504
38
kW-months/year
-
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,145
Cost:
$1,980
$814 18,506 $331 25 - - $814
18,506
kWh
$331
25
kW-months/year
-
-
$
08: 2.6127 MAINTAIN AIR FILTERS BY CLEANING OR REPLACEMENT Savings:
$1,001
Cost:
$240
$630 14,307 $371 28 - - $630
14,307
kWh
$371
28
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$136,070
Cost:
$329,059
$97,677 2,219,908 $35,534 2,681 $2,859 - $97,677
2,219,908
kWh
$35,534
2,681
kW-months/year
$2,859
-
$
TOTAL IMPLEMENTED Savings:
$70,297
Cost:
$80,237
$53,279 1,210,863 $17,018 1,284 - - $53,279
1,210,863
kWh
$17,018
1,284
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees