IAC logo
IAC Assessment: MI0367
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0367
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2020
Principal Product Aircraft Generators
NAICS 336413 - Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728 - Aircraft Parts And Equipment, Nec
Sales $50,000,000-$100,000,000
# of Employees 185
Plant Area (Sq.Ft.) 94,000
Annual Production 1,300 Pieces
Production Hrs. Annual 4,160
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $134,182 2,738,560 kWh $0.05
Electricity Demand $160,110 12,707 kW-months/year $12.60
Electricity Fees $80,194 - $ -
TOTAL ENERGY COSTS $374,486
RECOMMENDED SAVINGS* $99,256 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,142
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$38,331
Cost:
$2,480
$21,850 445,909 $16,481 1,308 $21,850
445,909
kWh
$16,481
1,308
kW-months/year
02: 2.3141 USE BATTERY STORAGE FOR DEMAND CONTROL Savings:
$21,335
Cost:
$38,237
$11,961 244,096 $9,374 744 $11,961
244,096
kWh
$9,374
744
kW-months/year
03: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$18,517
Cost:
$2,480
$18,517 377,900 - - $18,517
377,900
kWh
-
-
kW-months/year
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$8,815
Cost:
$120
$6,207 126,680 $2,608 207 $6,207
126,680
kWh
$2,608
207
kW-months/year
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,479
Cost:
$9,842
$1,828 37,303 $1,651 131 $1,828
37,303
kWh
$1,651
131
kW-months/year
06: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$3,241
Cost:
$4,900
$2,397 48,925 $844 67 $2,397
48,925
kWh
$844
67
kW-months/year
07: 2.4235 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES Savings:
$3,190
Cost:
$2,500
$2,245 45,818 $945 75 $2,245
45,818
kWh
$945
75
kW-months/year
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,348
Cost:
$1,980
$1,655 33,769 $693 55 $1,655
33,769
kWh
$693
55
kW-months/year
TOTAL RECOMMENDED Savings:
$99,256
Cost:
$62,539
$66,660 1,360,400 $32,596 2,587 $66,660
1,360,400
kWh
$32,596
2,587
kW-months/year
TOTAL IMPLEMENTED Savings:
$69,142
Cost:
$14,922
$48,402 987,792 $20,740 1,646 $48,402
987,792
kWh
$20,740
1,646
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand