IAC logo
IAC Assessment: MI0373
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0373
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2020
Principal Product Welding Tools
NAICS 333992 - Welding and Soldering Equipment Manufacturing
SIC 3548 - Welding Apparatus
Sales $10,000,000-$50,000,000
# of Employees 247
Plant Area (Sq.Ft.) 125,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 2,210
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $77,834 1,766,160 kWh $0.04
Electricity Demand $89,762 6,610 kW-months/year $13.58
Electricity Fees $31,721 - $ -
TOTAL ENERGY COSTS $199,317
RECOMMENDED SAVINGS* $30,714 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $21,898
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Usage Electricity Demand
$ kWh $ kW-months/year
01: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$8,619
Cost:
$1,840
$4,518 102,673 $4,101 302 $4,518
102,673
kWh
$4,101
302
kW-months/year
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$6,444
Cost:
$25,685
$2,506 56,964 $3,938 290 $2,506
56,964
kWh
$3,938
290
kW-months/year
03: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$5,501
Cost:
$16,518
$1,617 36,750 $3,884 286 $1,617
36,750
kWh
$3,884
286
kW-months/year
04: 2.4112 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS Savings:
$3,395
Cost:
$1,470
- - $3,395 250 -
-
kWh
$3,395
250
kW-months/year
05: 2.4226 USE / PURCHASE OPTIMUM SIZED COMPRESSOR Savings:
$3,315
Cost:
$27,047
$1,740 39,549 $1,575 116 $1,740
39,549
kWh
$1,575
116
kW-months/year
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,264
Cost:
$1,980
$1,825 41,484 $1,439 106 $1,825
41,484
kWh
$1,439
106
kW-months/year
07: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$176
Cost:
$480
$176 4,002 - - $176
4,002
kWh
-
-
kW-months/year
TOTAL RECOMMENDED Savings:
$30,714
Cost:
$75,020
$12,382 281,422 $18,332 1,350 $12,382
281,422
kWh
$18,332
1,350
kW-months/year
TOTAL IMPLEMENTED Savings:
$21,898
Cost:
$31,455
$9,025 205,123 $12,873 948 $9,025
205,123
kWh
$12,873
948
kW-months/year
Savings
Cost
$ kWh $ kW-months/year
Electricity Usage Electricity Demand Electricity Usage Electricity Demand