Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Miami |
---|---|
Assessment Year | 2020 |
Principal Product | Cosmetics |
NAICS | 325611 - Soap and Other Detergent Manufacturing |
SIC | 2844 - Toilet Preparations |
Sales | $10,000,000-$50,000,000 |
# of Employees | 65 |
Plant Area (Sq.Ft.) | 50,000 |
Annual Production | 5,500,000 Pieces |
Production Hrs. Annual | 4,000 |
Location (State) | FL |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $34,188 | 716,045 | kWh | $0.05 |
Electricity Demand | $25,365 | 2,268 | kW-months/year | $11.18 |
Electricity Fees | $13,753 | - | $ | - |
TOTAL ENERGY COSTS | $89,283 | |||
RECOMMENDED SAVINGS* | $27,394 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $17,846 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.9112 USE SOLAR HEAT TO HEAT WATER |
Savings: $10,293 Cost: $12,280 |
$8,436 | 175,756 | $1,857 | 166 | - | - |
$8,436 175,756 kWh |
$1,857 166 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA |
Savings: $9,548 Cost: $480 |
$7,289 | 151,855 | $2,259 | 202 | - | - |
$7,289 151,855 kWh |
$2,259 202 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS |
Savings: $2,976 Cost: $1,428 |
$1,388 | 28,911 | $1,588 | 142 | - | - |
$1,388 28,911 kWh |
$1,588 142 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $2,698 Cost: $1,306 |
- | - | - | - | $2,698 | 480 |
- - kWh |
- - kW-months/year |
$2,698 480 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $1,327 Cost: $2,436 |
$902 | 18,792 | $425 | 38 | - | - |
$902 18,792 kWh |
$425 38 kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $552 Cost: $882 |
$552 | 11,491 | - | - | - | - |
$552 11,491 kWh |
- - kW-months/year |
- - Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $27,394 Cost: $18,812 |
$18,567 | 386,805 | $6,129 | 548 | $2,698 | 480 | $18,567 386,805 kWh |
$6,129 548 kW-months/year |
$2,698 480 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $17,846 Cost: $18,332 |
$11,278 | 234,950 | $3,870 | 346 | $2,698 | 480 | $11,278 234,950 kWh |
$3,870 346 kW-months/year |
$2,698 480 Tgal |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Electricity Usage | Electricity Demand | Water Disposal |