IAC Assessment: MI0393
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0393
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2021
Principal Product Chemical Bleach
NAICS 325180 - Other Basic Inorganic Chemical Manufacturing
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $100,000,000-$500,000,000
# of Employees 31
Plant Area (Sq.Ft.) 44,000
Annual Production 30,000 Thousand Gallons
Production Hrs. Annual 8,568
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,911,286 41,280,592 kWh $0.05
Electricity Demand $92,608 67,786 kW-months/year $1.37
Electricity Fees $243,187 - $ -
Natural Gas $30,600 9,153 MMBtu $3.34
TOTAL ENERGY COSTS $2,277,681
RECOMMENDED SAVINGS* $135,694 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,433
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$100,476
Cost:
$227,400
- - - - $100,476 - - - -
-
kWh
-
-
kW-months/year
$100,476
-
$
-
-
MMBtu
02: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$685
Cost:
$480
$660 13,210 $25 18 - - - - $660
13,210
kWh
$25
18
kW-months/year
-
-
$
-
-
MMBtu
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,195
Cost:
$1,126
$4,043 80,872 $152 111 - - - - $4,043
80,872
kWh
$152
111
kW-months/year
-
-
$
-
-
MMBtu
04: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$11,648
Cost:
$3,107
$11,226 224,511 $422 308 - - - - $11,226
224,511
kWh
$422
308
kW-months/year
-
-
$
-
-
MMBtu
05: 2.9112 USE SOLAR HEAT TO HEAT WATER Savings:
$12,942
Cost:
$72,248
- - - - - - $12,942 3,875 -
-
kWh
-
-
kW-months/year
-
-
$
$12,942
3,875
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,748
Cost:
$2,211
$5,092 101,833 $656 479 - - - - $5,092
101,833
kWh
$656
479
kW-months/year
-
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$135,694
Cost:
$306,572
$21,021 420,426 $1,255 916 $100,476 - $12,942 3,875 $21,021
420,426
kWh
$1,255
916
kW-months/year
$100,476
-
$
$12,942
3,875
MMBtu
TOTAL IMPLEMENTED Savings:
$6,433
Cost:
$2,691
$5,752 115,043 $681 497 - - - - $5,752
115,043
kWh
$681
497
kW-months/year
-
-
$
-
-
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Natural Gas Electricity Usage Electricity Demand Electricity Fees Natural Gas