IAC logo
IAC Assessment: MI0406
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0406
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2022
Principal Product Plastic Packaging
NAICS 326113 - Unlaminated Plastics Film and Sheet (except Packaging) Manufacturing
SIC 3081 - Unsupported Plastics Film & Sheet
Sales $10,000,000-$50,000,000
# of Employees 67
Plant Area (Sq.Ft.) 42,000
Annual Production 5,000,000 Pieces
Production Hrs. Annual 6,120
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $519,155 2,421,239 kWh $0.21
Electricity Demand $48,384 5,104 kW-months/year $9.48
Electricity Fees $3,062 - $ -
TOTAL ENERGY COSTS $570,601
RECOMMENDED SAVINGS* $53,756 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,740
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees
$ kWh $ kW-months/year $ $
01: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$17,298
Cost:
$45,090
$12,634 59,036 $4,664 492 - - $12,634
59,036
kWh
$4,664
492
kW-months/year
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,075
Cost:
$5,674
$8,023 37,491 $1,052 111 - - $8,023
37,491
kWh
$1,052
111
kW-months/year
-
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$8,550
Cost:
$2,031
$7,867 36,764 $683 72 - - $7,867
36,764
kWh
$683
72
kW-months/year
-
-
$
04: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$6,468
Cost:
$15,450
$6,098 28,493 $370 39 - - $6,098
28,493
kWh
$370
39
kW-months/year
-
-
$
05: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,579
Cost:
$15,821
- - - - $5,579 - -
-
kWh
-
-
kW-months/year
$5,579
-
$
06: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$4,770
Cost:
$960
$788 3,682 $3,982 420 - - $788
3,682
kWh
$3,982
420
kW-months/year
-
-
$
07: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$2,016
Cost:
$100
- - - - $2,016 - -
-
kWh
-
-
kW-months/year
$2,016
-
$
TOTAL RECOMMENDED Savings:
$53,756
Cost:
$85,126
$35,410 165,466 $10,751 1,134 $7,595 - $35,410
165,466
kWh
$10,751
1,134
kW-months/year
$7,595
-
$
TOTAL IMPLEMENTED Savings:
$51,740
Cost:
$85,026
$35,410 165,466 $10,751 1,134 $5,579 - $35,410
165,466
kWh
$10,751
1,134
kW-months/year
$5,579
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Electricity Fees Electricity Usage Electricity Demand Electricity Fees