Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2022
Principal Product Cigars
NAICS 312230 - Tobacco Manufacturing
SIC 2121 - Cigars
Sales $10,000,000-$50,000,000
# of Employees 400
Plant Area (Sq.Ft.) 270,000
Annual Production 800,000,000 Pieces
Production Hrs. Annual 6,000
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,933,669 8,406,767 kWh $0.23
Electricity Demand $116,890 13,364 kW-months/year $8.75
Electricity Fees $5,400 - $ -
TOTAL ENERGY COSTS $2,055,959
RECOMMENDED SAVINGS* $252,900 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$126,797
Cost:
$24,547
$117,834 512,322 $8,963 1,025 - - $117,834
512,322
kWh
$8,963
1,025
kW-months/year
-
-
$
02: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$73,444
Cost:
$22,400
$68,253 296,750 $5,191 594 - - $68,253
296,750
kWh
$5,191
594
kW-months/year
-
-
$
03: 2.4238 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING Savings:
$9,634
Cost:
$2,055
$8,952 38,923 $682 78 - - $8,952
38,923
kWh
$682
78
kW-months/year
-
-
$
04: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT Savings:
$2,603
Cost:
$6,042
- - - - $2,603 - -
-
kWh
-
-
kW-months/year
$2,603
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$40,422
Cost:
$1,980
$31,206 135,680 $9,216 1,054 - - $31,206
135,680
kWh
$9,216
1,054
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$252,900
Cost:
$57,024
$226,245 983,675 $24,052 2,750 $2,603 - $226,245
983,675
kWh
$24,052
2,750
kW-months/year
$2,603
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Ancillary Material Cost Electricity Usage Electricity Demand Ancillary Material Cost