IAC logo
IAC Assessment: MI0421
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0421
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2023
Principal Product Clinical Diagnostics
NAICS 334516 - Analytical Laboratory Instrument Manufacturing
SIC 3826 - Analytical Instruments
Sales $100,000,000-$500,000,000
# of Employees 400
Plant Area (Sq.Ft.) 500,000
Annual Production 4,000 Units
Production Hrs. Annual 2,730
Location (State) FL
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $680,177 12,720,155 kWh $0.05
Electricity Demand $378,270 21,975 kW-months/year $17.21
Electricity Fees $175,310 - $ -
TOTAL ENERGY COSTS $1,293,401
RECOMMENDED SAVINGS* $604,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $69,964
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes
$ kWh $ kW-months/year $ Tgal $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$281,585
Cost:
$342,472
$194,878 3,676,935 $86,707 5,037 - - - - $194,878
3,676,935
kWh
$86,707
5,037
kW-months/year
-
-
Tgal
-
-
$
02: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$92,381
Cost:
$7,860
$63,875 1,205,191 $28,506 1,656 - - - - $63,875
1,205,191
kWh
$28,506
1,656
kW-months/year
-
-
Tgal
-
-
$
03: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$61,330
Cost:
$1,580
$25,955 489,709 $35,375 2,055 - - - - $25,955
489,709
kWh
$35,375
2,055
kW-months/year
-
-
Tgal
-
-
$
04: 2.7121 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT Savings:
$51,887
Cost:
$23,900
$35,912 677,581 $15,975 928 - - - - $35,912
677,581
kWh
$15,975
928
kW-months/year
-
-
Tgal
-
-
$
05: 2.8114 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE Savings:
$49,124
Cost:
$120
- - - - - - $49,124 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$49,124
-
$
06: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$47,137
Cost:
$1,580
$47,137 889,381 - - - - - - $47,137
889,381
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$11,466
Cost:
$1,492
- - - - $11,466 840 - - -
-
kWh
-
-
kW-months/year
$11,466
840
Tgal
-
-
$
08: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,009
Cost:
-
$6,009 113,371 - - - - - - $6,009
113,371
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
09: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,695
Cost:
$1,365
$2,695 50,851 - - - - - - $2,695
50,851
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
10: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$670
Cost:
$1,980
$463 8,742 $207 12 - - - - $463
8,742
kWh
$207
12
kW-months/year
-
-
Tgal
-
-
$
TOTAL RECOMMENDED Savings:
$604,284
Cost:
$382,349
$376,924 7,111,761 $166,770 9,688 $11,466 840 $49,124 - $376,924
7,111,761
kWh
$166,770
9,688
kW-months/year
$11,466
840
Tgal
$49,124
-
$
TOTAL IMPLEMENTED Savings:
$69,964
Cost:
$4,957
$9,167 172,964 $207 12 $11,466 840 $49,124 - $9,167
172,964
kWh
$207
12
kW-months/year
$11,466
840
Tgal
$49,124
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $
Electricity Usage Electricity Demand Water Disposal Administrative Changes Electricity Usage Electricity Demand Water Disposal Administrative Changes