IAC logo
IAC Assessment: MI0431
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MI0431
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Miami
Assessment Year 2023
Principal Product Metal Window and Door
NAICS 332321 - Metal Window and Door Manufacturing
SIC 3442 - Metal Doors, Sash, And Trim
Sales $50,000,000-$100,000,000
# of Employees 135
Plant Area (Sq.Ft.) 65,000
Annual Production 127,550 Pieces
Production Hrs. Annual 3,276
Location (State) PR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $229,342 1,005,840 kWh $0.23
Electricity Demand $53,138 5,710 kW-months/year $9.31
Electricity Fees $5,415 - $ -
TOTAL ENERGY COSTS $287,895
RECOMMENDED SAVINGS* $53,001 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.2628 UTILIZE A LESS EXPENSIVE COOLING METHOD Savings:
$11,840
Cost:
$55,500
$5,580 24,474 $760 82 $5,500 - $5,580
24,474
kWh
$760
82
kW-months/year
$5,500
-
$
02: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$10,760
Cost:
$11,272
$9,364 41,071 $1,396 150 - - $9,364
41,071
kWh
$1,396
150
kW-months/year
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$8,963
Cost:
$16,003
- - $8,963 963 - - -
-
kWh
$8,963
963
kW-months/year
-
-
$
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$8,323
Cost:
$680
$7,244 31,772 $1,079 116 - - $7,244
31,772
kWh
$1,079
116
kW-months/year
-
-
$
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$7,269
Cost:
$1,020
$3,785 16,600 $3,484 374 - - $3,785
16,600
kWh
$3,484
374
kW-months/year
-
-
$
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$5,030
Cost:
$80
$4,304 18,876 $726 78 - - $4,304
18,876
kWh
$726
78
kW-months/year
-
-
$
07: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$816
Cost:
$1,400
$710 3,112 $106 11 - - $710
3,112
kWh
$106
11
kW-months/year
-
-
$
TOTAL RECOMMENDED Savings:
$53,001
Cost:
$85,955
$30,987 135,905 $16,514 1,774 $5,500 - $30,987
135,905
kWh
$16,514
1,774
kW-months/year
$5,500
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes